1 / 14

Defining Airsheds for British Columbia

Defining Airsheds for British Columbia. Prepared for EPPC Subgroup on Definition of Airsheds Draft – For Discussion Only. Airshed Management in BC. Support in BC dates back to early 1990’s

oriel
Download Presentation

Defining Airsheds for British Columbia

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Defining Airsheds for British Columbia Prepared for EPPC Subgroup on Definition of Airsheds Draft – For Discussion Only

  2. Airshed Management in BC • Support in BC dates back to early 1990’s • Based on realization that point sources not only major influence on local air quality, and that other agencies or stakeholders have role to play • Particularly relevant to BC given complex terrain and the large influence that local sources have on local air quality • Not used as way to manage certain source sectors but as process to manage range of point, area and mobile sources within particular geographic area • Local airsheds delineated based on location of sources, common meteorological influences and geography, local support and local authority to act

  3. Airshed Management in BC [2] • Under Environmental Management Act: • Minister has authority to require area-based management plans (including airshed plans) • Greater Vancouver Regional District (GVRD) has delegated air management authority • Fraser Valley Regional District (FVRD) has delegated air planning authority through Order-in-Council • To-date, airshed planning in BC has been based voluntary, with plans developed for: • Metro Vancouver (GVRD) - FVRD • Whistler - Sea-to-Sky (draft) • Merritt - Okanagan (3 regional districts) • Williams Lake - Quesnel • Prince George - Bulkley Valley-Lakes District • PM management is primary focus (although ozone also concern in GVRD/FVRD, Sea-to-Sky and Okanagan)

  4. British Columbia Emissions[Based on 2000 Emission Inventory]

  5. British Columbia PM2.5 concentrations based on CWS metric (2004-2006)

  6. British Columbia Ozone concentrations based on CWS metric (2004-2006)

  7. British ColumbiaFactors influencing transport/dispersion • Trans-Pacific transport from Asia • Very complex terrain that influences local-to-regional scale dispersion of pollutants • Coastal sites: • Boundary layer meteorology • Seabreeze/landbreeze • Upslope/downslope • Summer stagnation/winter inversions • Interior sites: • Upslope/downslope • Valley effects • Capping inversions • Northeast sector: • Separated from rest of province by Rocky Mountains

  8. British ColumbiaPreliminary Regional or Macro Airsheds • Based on consideration of source regions and influence of topography/meteorology, following regional or macro airsheds identified: • Georgia Basin • Coastal BC (excluding Georgia Basin) • Interior BC • Northeast BC

  9. Potential Regional Airsheds NE Sector Interior BC Boundaries preliminary only Coastal BC Georgia Basin

  10. British ColumbiaGeorgia Basin • Includes coastal areas of BC along Georgia Strait and Juan de Fuca Strait • Largest population area in province (incl. Vancouver, Victoria and Nanaimo) • Previously characterized as part of Border AQ Study • Home to several coastal pulp mills + cement plants • In Lower Fraser Valley (LFV), transportation sector (incl. marine) also large source of emissions • Includes following regional airsheds: • LFV (Metro Vancouver/FVRD) • Whistler/Sea-to-Sky Corridor

  11. British ColumbiaCoastal BC outside of Georgia Basin • Includes west coast of Vancouver Island and north coast (including port of Prince Rupert) • Along with Georgia Basin, may comprise BC part of potential Sulfur Emission Control Area • Aluminum smelter in Kitimat also within this area

  12. British ColumbiaInterior BC (excluding NE sector) • Area east of Coast Mtns and west of Rocky Mtns • Very complex terrain • Includes a number of local airshed management areas (e.g. Prince George, Quesnel, Williams Lake, Bulkley Valley-Lakes District and Okanagan) • Home to a number of pulp mills, OSB plants, plywood mills, a refinery, a Pb-Zn smelter and several mines • Any management approaches, including cap-and-trade programs, applied to this region will require further consideration of impacts on local airsheds

  13. British ColumbiaNortheast BC • Comprised of area to the northeast of Rocky Mountains • Major O&G producing area of province • Major SOx emissions area • More in common with airshed containing NW Alberta than with rest of BC

  14. Final Considerations • Need to be clear how definition of airsheds within federal regulatory framework complements or differs from existing airsheds such as identified in BC (they should be complementary) • In areas of complex terrain or with local airshed management approaches already in place, sub-regional scale implications of proposed federal approaches should be considered

More Related