1 / 10

VOP-55

Blocs 8x8 BM.5-b8. Image Ref. VOP-50. VOP-55’. VOP-55. Prédiction d’images. Image P:. Projection vers l'arrière. ou. Projection vers l’avant. Trame précédente. Trame courante. Trame future. Image P. Trame de référence. Trame prédite. Image B:. Projection vers l'arrière.

oriel
Download Presentation

VOP-55

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Blocs 8x8 BM.5-b8 Image Ref. VOP-50 VOP-55’ VOP-55

  2. Prédiction d’images Image P: Projection vers l'arrière ou Projection vers l’avant Trame précédente Trame courante Trame future Image P Trame de référence Trame prédite

  3. Image B: Projection vers l'arrière Projection vers l’avant + Trame précédente Trame B Trame future

  4. VER ARTICULO DE PCS PARA RESULTADOS Y COMENTARIOS fFigure 2. The blocks have been ordered according to the gain in term of PSRN reduction. The x axis represents the number of blocks which have a PSNR reduction at least equal to the corresponding value of the y axis. For CIF sequences, the total number of blocks is 396.

  5. With Block Matching With NPR model dFigure 3.The marked blocks shows where the NPM model gives a gain of more than 1dB compared to the trasnational model.

  6. With Block Matching With NPR model

More Related