90 likes | 253 Views
MARCOOS/ESPreSSO ROMS. 5 km resolution for assimilation 1 km resolution for forecast NCEP NAM 3-hour meteorology 1-day average USGS gauge river flow Open boundaries: ROMS MAB-GoM nested within GODAE-HyCOM operational N. Atlantic (He/NCSU) > OPeNDAP data portal
E N D
MARCOOS/ESPreSSO ROMS 5 km resolution for assimilation 1 km resolution for forecast NCEP NAM 3-hour meteorology 1-day average USGS gauge river flow Open boundaries: ROMS MAB-GoM nested within GODAE-HyCOM operational N. Atlantic (He/NCSU) > OPeNDAP data portal > Assimilation experiments in 2006 (4DVar) > Glider observation analysis (Representers) RU Coastal Ocean Modeling and Prediction group John Wilkin, Gordon Zhang, Julia Levin, Naomi Fleming, Javier Zavala-Garay, Hernan Arango
Assimilation and observing system design experiments in 2006 (LaTTE and SW06) > LaTTE subdomain RU CODAR (with tides) All glider CTD All moored T/S > SW06/MARCOOS/ESPreSSO Now: Climatology (Hydrobase); AVISO altimetry in Slope Sea; SST (AVHRR/MODIS/GOES blended from PFEL CoastWatch) Soon: regional climatology; glider; VOS/XBT; Argo Future: coastal along-track altimetry; in situ and satellite optics and ocean color > Glider observing system design use representers to analyse information content of MARCOOS glider tracks
Forecast skill improvement with assimilation of CODAR60-day ensemble of all analyses/forecastsu “along-shelf” component
Forecast skill improvement with assimilation of CODAR60-day ensemble of all analyses/forecastsv “across-shelf” component
The “Representer” (Bennett) is a measure of the covariance/correlation between ocean state variables and a pattern of observationsMethod: integrate the adjoint model backwards forced at observational locations, then the tangent linear model forward to carry “information” to analysis/forecast times Cost function: Covariance between J and temperature, , reflects the influence of glider observation At time = finish of glider mission
Cost function: Covariance between J and temperature, , reflects the influence of glider observation At time = 5 days after finish of glider mission