CHE 185 – PROCESS CONTROL AND DYNAMICS

CHE 185 – PROCESS CONTROL AND DYNAMICS. CONTROL OBJECTIVES. CATEGORIES OF OBJECTIVES. PROCESS OBJECTIVES QUANTITY MEET PRODUCTION TARGETS OPERATE AT CONSTANT LEVELS QUALITY ALL PRODUCT TO MEET MINIMUM CRITERIA MINIMIZE PRODUCTION OF OFF-SPEC OR BYPRODUCT COMPONENTS.

orsin
Download Presentation

CHE 185 – PROCESS CONTROL AND DYNAMICS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CHE 185 – PROCESS CONTROL AND DYNAMICS CONTROL OBJECTIVES

  2. CATEGORIES OF OBJECTIVES • PROCESS OBJECTIVES • QUANTITY • MEET PRODUCTION TARGETS • OPERATE AT CONSTANT LEVELS • QUALITY • ALL PRODUCT TO MEET MINIMUM CRITERIA • MINIMIZE PRODUCTION OF OFF-SPEC OR BYPRODUCT COMPONENTS

  3. CATEGORIES OF OBJECTIVES • PROFITABILITY • MAXIMIZE YIELDS • MINIMIZE UTILITY CONSUMPTION • Products with Reduced Variability • reduced variability products are in high demand and have high value added • Product certification (e.g., ISO 9000) are used to guarantee product quality

  4. Example of Improved Control

  5. PLANT OPERATIONAL OBJECTIVES • RELIABILITY • ON-STREAM TIME • MINIMIZE UNSCHEDULED OUTAGES • SAFETY - FAIL SAFE OPERATION • OUT-OF-RANGE ALARMS • EMERGENCY SHUTDOWN – PANIC BUTTON • EMERGENCY INTERLOCKS – AUTOMATIC OPERATION

  6. SAFETY RELIEF SYSTEMS • STANDARDS AND CODES • ASME (American Society of Mechanical Engineers) Boiler & Pressure Vessel Code, Section VIII Division 1 and Section I • API (American Petroleum Institute) Recommended Practice 520/521, API Standard 2000 et API Standard 526 • ISO 4126 (International Organisation for Standardisation)

  7. MODEL DERIVATION • INVENTORY TANK • DESIGN BASES • STEADY STATE FLOWS • DISCHARGE FLOW IS A FUNCTION OF h • CONSTANT AREA A • CONSTANT DENSITY ρ

  8. DERIVE EQUATIONS MASS BALANCE ASSUMPTION OF STEADY STATE

  9. DERIVE EQUATIONS • VALVE CHARACTERISTICS • LEVEL CHANGES • LINEAR ODE • NONLINEAR ODE

  10. MODEL DERIVATION • HEATING TANK • DESIGN BASES • CONSTANT VOLUME • PERFECT MIXING IN VOLUME • PERFECT INSULATION • CONSTANT FLUID PROPERTIES, DENSITY ρ AND HEAT CAPACITY cP

  11. DERIVE EQUATIONS MASS BALANCE ENERGY BALANCE

  12. DERIVE EQUATIONS • AS INITIAL VALUE PROBLEM • Given • physical properties (r, Cp) • operating conditions (V, w, Ti, Q) • initial conditionT(0) • Integrate model equation to find T(t)

  13. MODEL DERIVATION • CSTR • REACTION A → B • DESIGN BASES • Constant volume • FEED IS Pure A • Perfect mixing • INSULATED • Constant FLUID properties (r, Cp, DH, U) • Constant cooling jacket tempERATURE

  14. OTHER RELATIONSHIPS • Constitutive relations • Reaction rate/volume • r = kcA= k0exp(-E/RT)cA • Heat transfer rate: • Q = UA(Tc-T)

  15. DERIVE EQUATIONS • MASS BALANCE • COMPONENT BALANCE ON A

  16. DERIVE EQUATIONS ENERGY BALANCE

  17. SOLUTION CONSTRAINTS • EQUATION PROPERTIES • 2 Odes • For dynamic model Time is the independent variable • Nonlinear and coupled • Initial value problem requires numerical solution • Degrees of freedom • 6 unknowns • 2 equations • Must specify 4 variable values

  18. MODEL DERIVATION • BIOCHEMICAL REACTOR (GENERAL) • DESIGN BASES • CONTINUOUS OPERATION • Sterile feed • Constant volume • Perfect mixing • Constant REACTION temperature & pH • Single rate limiting nutrient • Constant yields • Negligible cell death

  19. DERIVE EQUATIONS • CELL MASS • DEFINITION OF TERMS • VR = reactor volume • F = volumetric flow rate • D = F/VR= dilution rate • Non-trivial steady state: • Washout:

  20. DERIVE EQUATIONS • PRODUCT RATE • SUBSTRATE CONCENTRATION • S0= feed concentration of rate limiting substrate • Steady-state:

  21. SOLUTION CONSTRAINTS • EQUATION STRUCTURE • State variables: x = [XSP]T • Third-order system • Input variables: u = [DS0]T • Vector form:

  22. acetaldehyde/ pyruvate (S4ex) degraded products glucose r7 extracellular J0 J NADH NAD+ acetaldehyde/ pyruvate (S4) glucose (S1) ethanol r4 intracellular ATP (A3) r1 ADP (A2) ATP r3 r5 NAD+ (N1) NADH (N2) ADP NAD+ NADH G3P/DHP (S2) glycerol 1,3-BPG (S3) r6 r2 YEAST METABOLISM • BIOCHEMICAL REACTOR (ETHANOL)

  23. MODEL COMPONENTS • Intracellular concentrations • Intermediates: S1, S2, S3, S4 • Reducing capacity (NADH): N2 • Energy capacity (ATP): A3 • Mass action kinetics for r2-r6 • Mass action kinetics and ATPinhibition for r1

  24. Dynamic Model Equations • Mass balances • Conserved metabolites • MATRIX

  25. REVIEW OF OBJECTIVES FOR CONTROL SYSTEMS PLANT OBJECTIVES - OVERALL PRODUCTION FROM THE FACILITY COMPONENT OBJECTIVES -INDIVIDUAL STEPS IN THE PROCESS PROVISION FOR OPERATOR CONTROL OPTIMIZATION OF OPERATIONS

  26. PLANT OPERATIONAL OBJECTIVES • ENVIRONMENTAL PROTECTION • MINIMIZE EMISSIONS FROM PROCESS UPSETS • RELIABLE OPERATION OF ALL POLLUTION CONTROL EQUIPMENT • VENTS • FLARES • SCRUBBERS • PRESSURE RELIEF http://www.corrocare.com/air_pollution_control_equipment.html

  27. PLANT OPERATIONAL OBJECTIVES • FLEXIBILITY - DYNAMIC RESPONSE • SYSTEM TO ADJUST AUTOMATICALLY TO ANTICIPATED CHANGES IN: • PRODUCTION RATES • QUALITY SPECIFICATIONS • COMPOSITIONS OF FEED • INTERMEDIATE STREAMS

  28. PLANT OPERATIONAL OBJECTIVES • USER FRIENDLY OPERATOR INTERFACE • MINIMIZE NUMBER OF VARIABLES NECESSARY TO CONFIRM THE PROCESS STATUS • DESIGN THE SYSTEM SO THE “NATURAL” OPERATOR REACTION TO PROCESS VARIATIONS IS ANTICIPATED • PROVIDE AN INFORMATION INTERFACE FOR OPERATION/ENGINEERING

  29. PLANT OPERATIONAL OBJECTIVES • MONITORING AND OPTIMIZATION • DETERMINE THE CONTROL LIMITS FOR THE PROCESS • DETERMINE THE OPTIONS FOR COST REDUCTION

  30. PLANT OPERATIONAL OBJECTIVES • STARTUP/SHUTDOWN • ROUTINE START-UP CONTROL • MINIMIZE START-UP TIMES • ROUTINE SHUTDOWN CONTROL • RESPOND TO SHORT TERM SHUTDOWNS WITH MINIMUM RESTART TIME • SAFE EMERGENCY SHUTDOWN

  31. PLANT OPERATIONAL OBJECTIVES • EQUIPMENT PROTECTION • INTEGRATE DESIGN SO FAILURE OF ONE PART OF THE FACILITY DOES NOT TRANSFER TO FAILURE IN ANOTHER PART • INTERLOCK SYSTEMS TO PREVENT EQUIPMENT DAMAGE IN THE EVENT OF A PROCESS INTERRUPTION

  32. COMPONENT OPERATIONAL OBJECTIVES. • SIMILAR TO PLANT OBJECTIVES • COMPONENT RELIABILITY • MINIMIZE COMPONENT DEGRADATION OR FAILURE. • REDUNDANCY WHEN PRACTICAL. • MINIMAL LOCAL ADJUSTMENT FOR NORMAL PROCESS VARIATIONS

  33. COMPONENT OPERATIONAL OBJECTIVES. • SAFE OPERATION - • COMPONENT DESIGNS FOR SAFE OPERATION WITHIN THE ANTICIPATED OPERATING RANGES FOR THE PROCESS • RELIEF SYSTEMS TO AVOID CATASTROPHIC FAILURE IF THE PROCESS EXCEEDS THE SAFE OPERATING RANGES.

  34. COMPONENT OPERATIONAL OBJECTIVES. • ENVIRONMENTAL PROTECTION • DESIGNS TO AVOID LEAKS OF PROCESS MEDIA • DESIGNS TO INDICATE LEAKS OF PROCESS MEDIA • DESIGNS TO AVOID SUPERSONIC FLUID CONDITIONS OR OTHER FORMS OF SOUND POLLUTION

  35. COMPONENT OPERATIONAL OBJECTIVES. • EASE OF OPERATION • LOCAL OPERATION • REMOTE OPERATION • MONITORS • TO DETERMINE CURRENT STATUS OF COMPONENT • TO DETERMINE THE NEED FOR MAINTENANCE OR REPLACEMENT

  36. COMPONENT OPERATIONAL OBJECTIVES. • PROVIDE THE OPERATOR WITH ADEQUATE INFORMATION • FOR ROUTINE START-UP AND SHUTDOWN FROM A REMOTE LOCATION. • FOR LOCAL OPERATION DURING STARTUP OR SHUTDOWN

  37. COMPONENT OPERATIONAL OBJECTIVES. • EQUIPMENT PROTECTION • DESIGNS TO INDICATE OUT-OF-RANGE CONDITIONS SO OPERATORS CAN TAKE PROPER ACTION • DESIGNS TO INITIATE AUTOMATIC SHUTDOWN SEQUENCES FOR OUT-OFCONTROL CONDITIONS.

  38. TYPES OF CONTROL http://www.controlloopfoundation.com/continuous-chemical-reactor-process.aspx http://www.controlloopfoundation.com/batch-chemical-reactor-workspace.aspx CONTINUOUS BATCH SEMI-CONTINUOUS COMBINATIONS OF THE ABOVE