150 likes | 587 Views
OOO BSH Bytowije Pribory. Round-Table for Suppliers St. Petersburg 19 May 2011. Robert Bosch GmbH. Siemens AG. 2010. 50 %. 50 %. BSH Bosch und Siemens Hausgeräte GmbH. 1967. BSH-Group: Shareholders. BSH-Group: Business at a Glance. Number of brands : 13
E N D
OOO BSH Bytowije Pribory Round-Table for Suppliers St. Petersburg 19 May 2011
Robert Bosch GmbH Siemens AG 2010 50 % 50 % BSH Bosch und Siemens Hausgeräte GmbH 1967 BSH-Group: Shareholders Round-Table for Suppliers I STP I 19 May 2011 I Slide: 2
BSH-Group: Business at a Glance • Number of brands: 13 • Number of employees: ca. 43,000 worldwide • Corporate sales in 2010: 9.1 billion EUR • Number of companies: ca. 70 in 46 countries • Number of factories: 41 in 13 countries in Europe, Americas and Asia. ~ 40 Millions of home appliances produced p.a. • Multiple awards for products and factories As of Dec. 31, 2009 Round-Table for Suppliers I STP I 19 May 2011 I Slide: 3
BSH location in Strelna -today- • Foundation of BSH Bytowije Pribory21 March 2005 • Start of production Cooling 1st Step Sept. 2007 • Production surface 21,000 sq.m • Capacity 250,000 units p.a. • Extension production Cooling Step 2 • Extended surface 7,000 sq.m • Total surface production 28,000 sq.m • Capacity total 500,000 units p.a. • Logistics Warehouse • Total surface 20,000 sq.m • Assembly of Washing machines • Start of production July 2010 • Capacity 100,000 units p.a. • Employees* 700 total • 520 in production • Building new factory Washing machines • Capacity 350,000 units p.a. • Start of production June 2012 • Total investment till end of 2011 € 100 M * As of 03/2011 Round-Table for Suppliers I STP I 19 May 2011 I Slide: 4
February 2011 Round-Table for Suppliers I STP I 19 May 2011 I Slide: 5
Washing Step 2 Cooling Step 1 Cooling Step 2 Washing Step 1 Extension of BSHP-RUS • The capacity increase for the cooling appliance factory up to 500,000 units per year finished 1 July 2010 • The logistic extension finished 1 July 2010. • First step of washing machine production with a capacity of 100,000 units per year started 1 July 2010. • Second step of washing machine production with a capacity of 350,000 units per year will start 1of June 2012 • There are further possibilities for expansion on the site Logistics Step 2 Logistics Step 1 Status 2007 Status 2010 Extension options Round-Table for Suppliers I STP I 19 May 2011 I Slide: 6
We produce Bottom-Freezer refrigerators in St. Petersburg... Round-Table for Suppliers I STP I 19 May 2011 I Slide: 7
SKD Slimline actual 3 VIB’s • 5,0 kg Load capacity • 1000 rpm o. 1200 rpm • 45cm depth • 3 Option buttons • LED Symboldisplay • Superfast programme 30 minutes • Mixed load programme • 30cm door • Actual 3 VIB‘s • 3 additional from April 2011 Round-Table for Suppliers I STP I 19 May 2011 I Slide: 8
in progress Procedure of Supplier Enabling Program Finished ü Activities stopped ü H33 N.N. 12/08 ü R2x N.N. 12/08 ü R52 N.N. 12/08ü R2x N.N. 02/09 • H33 N.N. C12B • R2x N.N. B12A • R2x N.N. C12B • R2x N.N. B12A • T03 N.N. B18A • N02 N.N. B09A • N02 N.N. B09A • B33 N.N. (on hold) B06A • B33 N.N. B09A • R52 N.N. C18B • Q11 N.N. • B33 N.N. • B33 N.N. • R2x N.N. • H33 N.N. R2x N.N. H33 N.N. C12C B33 N.N. C12C N02 N.N. C12C • B33 N.N. SEP Supplier Marketing Potential Analysis (PA) Pre Selection Supplier Enabeling Released Suppliers Supplier Development Round-Table for Suppliers I STP I 19 May 2011 I Slide: 9
Need for localization: Refrigerators Round-Table for Suppliers I STP I 19 May 2011 I Slide: 10
Need for localization: Washing machine assembly SKD Round-Table for Suppliers I STP I 19 May 2011 I Slide: 11
Thank you! • ООО «БСХ Бытовые Приборы» • ул. Карла Сименса, 1, лит. А, • Петергоф, 198515, Санкт-Петербург • тел. (812) 605-5555 • факс (812) 605-5550 • www.bsh-group.ru • Rassadin, Anton (STP/PR) Anton.Rassadin@bshg.com • Solovykh, Konstantin (STP/FP) Konstantin.Solovykh@bshg.com • Sharoshkin, Sergey (STP/PU) Sergey.Sharoshkin@bshg.com Round-Table for Suppliers I STP I 19 May 2011 I Slide: 12