An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ALLOCATIONS for the Integrated National Electrification Programme 2009/10 Presentation to the Select Committee on Finance 25 February 2009

  2. CONTENTS • Electrification Programme • MTEF Allocation • Allocation criteria • Municipal Allocations 2009/10 • Connections 2009/10 • Eskom Allocation 2009/10 • Connections 2009/10 • Conclusion and questions • Energy Efficiency and Demand Side Management Programme • 8. MTEF Allocation • 9. Allocation criteria • 10. Municipal Allocations 2009/10 • 11. Connections 2009/10 • 12. Eskom Allocation 2009/10 • 13. MW savings 2009/10 • 14. Conclusion and questions

  3. Electricity value chain GENERATION Electricity is Generated by burning of fossil fuels (coal, oil, or natural gas), use of nuclear technology and hydro capability 2 TRANSMISSION SUBSTATIONS MUNICIPALITIES 1 TRANSMISSION LINES 3 TRANSMISSION (400/275 kV) High Voltage electricity is carried between Generation and required Distribution through Transmission networks (or Transmission grids) DISTRIBUTION LINES POWER STATIONS DISTRIBUTION (132/33 kV) The distribution networks collect ‘stepped down’ electricity from the transmission networks and deliver it to Redistributors /End Users DISTRIBUTION SUBSTATIONS The voltage levels of electricity are further transformed to meet Distribution requirements SERVICE CONNECTION RETICULATION HV LINE (11 & 22kV) Customer consumption is measured at the point of supply in KWh. This information is used to measure and bill consumption levels utilised/sold RETICULATION LV LINE (380/220V)

  4. MTEF ALLOCATION

  5. ALLOCATION CRITERIA FOR 2009/10 • Focus on backlog • Rural bias • Past performance • Project type • Licensed authority capacity • Government priorities

  6. CAPITAL EXPENDITURE 2009/10 MUNICIPAL ALLOCATION (Schedule 6)

  7. BULK INFRASTRUCTURE – MUNICIPALITIES

  8. CONNECTIONS Planned Household Connections 2009/10

  9. ESKOM PROGRAMME

  10. Eskom Allocations 2009/10 (Schedule 7)

  11. BULK INFRASTRUCTURE - ESKOM

  12. Planned Household Connections 2009/10

  13. Eskom Allocation per Province 2009/10

  14. Eskom Allocation per Province 2009/10 Schools

  15. Planned Schools Connections 2009/10

  16. Eskom Allocation per Province 2009/10 Backlog Schools and Clinics

  17. The way forward • Preparation for the implementation of the 2009/10 Programme (All contracts prepared) • Concentrate on Bulk infrastructure development for electrification • Maximize the number of schools to be electrified in 2009/10 (Eradicate backlog)

  18. Electricity Demand Side Management

  19. MTEF ALLOCATIONS

  20. Allocation Criteria • Focus on reducing Demand • Urban bias • Project type • Priority to ensure security of supply • Licensed authority capacity • URP • Government priorities

  21. Municipal Allocations 2009/10

  22. Eskom Allocations 2009/10

  23. Conclusion and questions