Chapter 6Erection Manual Format To replace “Construction Specifications”
Primary Sections 6.1 GENERAL INFORMATION 6.2 LOCATION AND DESCRIPTION OF MAJOR COMPONENTS 6.3 ERECTION INSTRUCTIONS
6.1 GENERAL INFORMATION 6.1.1 Scope: This manual provides the assembly instructions for the steel bridge for use in the competition.
6.2.1 Erection drawing • Showing order in which members and/or assemblies are added to the evolving bridge.
6.2.2 Assembly drawings • Showing the order in which individual members are added to create the assemblies, if any. Sheet 1 with numbers/letters and sequence.
6.2.3 Summary of members, equipment, hardware, and tools to include quantity • Members • Nonfabricated items such as bolts, nuts, hardhats, goggles, aprons etc. Sheets 2-3.
6.3.1 Preventive maintenance checks • Recheck rule sizes and weight of components • Inspect components for damage Sheets 4-6.
6.3.2 Staging layout • Include all members, equipment, tools, hardware, temporary piers Sheet 7.
6.3.3 Work party required • How many people? • How many barges? • Crew member designations
6.3.4 Erection • Who, What, When, How ? • All members, assemblies, equipment, and tools must be indicated in Section 6.2. • Note location of any temporary piers. Sheets 8-20.
6.3.5 Breakdown Sheets 21-26.