1 / 7

Ventilation Map

Entry 3. Entry 2. Entry 1. Temporary Stopping E. Temporary Stopping D. D. Timbers Fire Out. Caved Impassable. LHD Impassable. Temporary Stopping C. Temporary Stopping B. Temporary Stopping A. D. Door Closed. Mine Fan ON /OFF. FAB. West Shaft (Intake). East Decline.

osanna
Download Presentation

Ventilation Map

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Entry 3 Entry 2 Entry 1 Temporary Stopping E Temporary Stopping D D Timbers Fire Out Caved Impassable LHD Impassable Temporary Stopping C Temporary Stopping B Temporary Stopping A D Door Closed Mine Fan ON/OFF FAB West Shaft (Intake) East Decline N Ventilation Map

  2. Entry 3 Entry 2 Entry 1 Break into old mine Smoke O2 = 7 % CO = 20000 ppm NO2 = 300 ppm Loaded Face with (Unshunted lead wires) Intense Heat Bill Owen Face Drill Loose Roof Scaler Pager Phone Fire Ext. Door Closed D Tool Room 2 Sets Building Materials Timbers On Fire Charred Timbers Right & Left Ken Sims Caved Impassable LHD Impassable Water Knee Deep 4 ft. Back Smoke O2 = 9 % CO = 14000 ppm NO2 = 200 ppm Smoke O2 = 9 % CO = 14000 ppm NO2 = 200 ppm Curtain Open Smoke O2 = 9 % CO = 14000 ppm NO2 = 200 ppm Water to Roof D Door Open Curtain Open Pump Controls ON/OFF Pager Phone Mine Fan ON/OFF Jim Bell (wet) 1 Set Building Materials FAB West Shaft (Intake) East Decline Problem Map Smoke O2 = 14 % CO = 14000 ppm NO2 = 150 ppm O2 = 20 % CO = 350 ppm NO2 = 3 ppm

  3. Entry 3 Entry 2 Entry 1 FAB West Shaft East Decline N Team Map

  4. Entry 3 Entry 2 Entry 1 FAB West Shaft East Decline N Fresh Air Base Map

  5. Entry 3 Entry 2 Entry 1 FAB West Shaft East Decline N Co-Captain’s Map

  6. Entry 3 Entry 2 Entry 1 FAB West Shaft East Decline N Judges’ Map

  7. 20’ x 10’ pillar 20’ x 10’ pillar 10’ entries & 10’ crosscuts 20’ x 20’ pillar 20’ x 20’ pillar 10’ entries & 10’ crosscuts 20’ x 20’ pillar 20’ x 20’ pillar 10’ entries & 10’ crosscuts Construction Map

More Related