An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HP: Hyper-V Cloud Reference Architecture Adam Richardson HP Adam.Richardson@HP.com

  2. The problem with today’s infrastructure • Many people • Many steps • Many errors • Much time Business selectsapplication IT planning meetings Purchase assets Set up Facilities Coordinate install process Load OS Load OSs Set up storage Set up networks Install servers Load VMs Deploy application Patch VMs, OSs, applications Set approvals, Access controls Test and quality Activate service Manage over lifecycle Weeks to months

  3. Storage Servers Converged Infrastructure Power & cooling Network Management software Cloud starts with a Converged Infrastructure IT sprawl has business at the breaking point Cloud service delivery platform • Virtualization as a key enabler • Align people, processes and technology

  4. Comprehensive IT Stack IntegrationInfrastructure-to-Application Solutions and Services Separate offerings from the #1 IT and #1 software companies FROM TO Most integrated IT stack in the industry HP Microsoft HP, Microsoft, and Partner Services Infrastructure-to-Application Integration Services Services SQL Servertemplates, sizing Exchangetemplates, sizing SQL Server Exchange SQL Server Exchange Server Other Microsoft and 3rd Party Applications HP BTO Enterprise Mgmt System Center Converged Infrastructure OS and Virtualization Interoperable Management Windows or other OSs Windows Hyper-V or others Hyper-V Integrated Virtualization HP Infrastructure HP ServersStorage andNetworking System Center HP Insight and BTO SW Servers storage and networking

  5. Next Generation Infrastructure to Application Model Hyper-V Cloud Reference Architecture Service oriented Automatically provisioned and optimized Public Self managed and continuously self-tune Distributed and elastic HP BladeSystem Matrix Always available

  6. HP BladeSystem Matrix The Foundation for Private Cloud and IaaS Resource Pools Service Catalog • Personalize your Cloud: • Billing/chargeback • Approval flows • Other processes MatrixCloud APIs HP Converged Infrastructure Self-Service Portal Service Delivery Capacity & Management

  7. Royal Mail Group & Hyper-V Neil MacCuish CSC Microsoft Practice nmaccuish@csc.com

  8. Hyper-V at Royal Mail Group Background • Situation • Large Legacy Estate • Multiple platforms and applications • Operationally at “green” but issues • CSC Microsoft Practice engaged by Adrian Steel, Head of Infrastructure, to deliver platform • Vision • Improve business agility • Reduce TCO • Enable Legacy Estate to be addressed • Microsoft as a Strategic Supplier

  9. Logical Model

  10. Physical Model • Toolsets • HP BladeSystem c-Class c7000 enclosure, server blades and Virtual Connect with Flex-10 • HP StorageWorks 4400 Enterprise Virtual Array • HP Insight Control Environment • HP StorageWorks Command View EVA • Microsoft System Center Configuration Manager (SCCM) • Microsoft System Center Operations Manager (SCOM) • Microsoft System Center Virtual Machine Manager (SCVMM) • Microsoft System Center Data Protection Manager (SCDPM)

  11. The Virtualisation Project Summary • Headlines • 9 months to platform ready • Up to 720 guests • Delivering against plan ** • Some key points/learnings • Issues not really technology based • ** Build it and they shall come • Keeping it green, Service Integration • One team – HP/CSC/Microsoft

  12. © 2008 Microsoft Corporation. All rights reserved. Microsoft, Windows, Windows Vista and other product names are or may be registered trademarks and/or trademarks in the U.S. and/or other countries. The information herein is for informational purposes only and represents the current view of Microsoft Corporation as of the date of this presentation. Because Microsoft must respond to changing market conditions, it should not be interpreted to be a commitment on the part of Microsoft, and Microsoft cannot guarantee the accuracy of any information provided after the date of this presentation. MICROSOFT MAKES NO WARRANTIES, EXPRESS, IMPLIED OR STATUTORY, AS TO THE INFORMATION IN THIS PRESENTATION.