An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. www.segi.com.pl

  2. Production of energy from the biomass-an option for the sustainable development of industrial land Energy from the biomass

  3. Main idea of the project • Creating an integral system of renewable energy production comprising 2 main elements: • Pellets production line (production capacity: 1 t/h) • Plantation of an energy plant – a hollyhock species Sida hermaphrodita as a source of biomass for pellets production • within the industrial area Energy from the biomass

  4. Project developer Limited partnership founded for the purpose of the project: • SEGI-AT Sp. z o. o. (Ltd.) • KGHM Polska S.A. • Other investors Energy from the biomass

  5. Shareholders Energy from the biomass

  6. Location of the project • South-western Poland • community Rudna with a deteriorating agriculture and industrial areas • High unemployment rate: ca. 20% • Protective area around copper works and the flotation waste reservoir (ca. 14 km2) Energy from the biomass

  7. Plantation of Sida hermaphrodita (1) • size: 300 ha (ca. 25.000 plants per ha) • very high annual yields (up to > 20 t dry biomass/ha) • low climate and soil requirements • suitable for industrial land • easy in cultivation, traditional methods • low moisture content in the biomass (25%) • good parameters as a fuel (comparable with wood) Energy from the biomass

  8. Unique annual productivity - compared with Salix Energy from the biomass

  9. Plantation of Sida hermaphrodita (2) • harvesting: December – March • stored in the open air • easily cut into pieces • raw material for pellets production in form of chips • cost of dry biomass production: 25 EUR/t Energy from the biomass

  10. Sida hermaphrodita – anenergy plant Energy from the biomass

  11. Plantation of Sida hermaphroditaSpring Autumn Energy from the biomass

  12. Pelleting plant (1) • Placed in the vicinity of the plantation within the existing infrastructure • Production capacity: 1 t/h • Expected annual output: 6000 t pellets • Energy consumption: 600 MWh/year • Energy output from the produced pellets • ca. 30.000 MWh/year (=108.000 GJ/year) Energy from the biomass

  13. Pellets production line Energy from the biomass

  14. Pelleting plant (2) • Consists of 3 main elements: • a dryer • hammer mill • pellet mill • Raw material supply for pellets production: • In the initial stage: waste wood from the wood industry • In the long run (after 2-3 years` operation): biomass of Sida hermaphrodita Energy from the biomass

  15. High density pellets – environmentally friendly solid bio-fuel, very comfortable in use for both households and industrial plants Energy from the biomass

  16. Product characteristics • diameter: 6-8 mm • length: 2-3 cm • density: 1,15 kg/m3 • calorific value: 18 MJ/kg • low ash content (0,5% - 1%) • without binding agents • high grade of homogeneity Energy from the biomass

  17. Financial details (1) • Total cost of the investment: 1 mln EUR over 2 years (2005-2006) • Pellet production plant: 650.000 EUR • Plantation: 350.000 EUR • Initial capital of a new SEGI-KGHM partnership: 670.000 EUR • Grant in frames of EU structural funds and PHARE Programme Energy from the biomass

  18. Financial details (2) • Annual operating costs: 330.000 EUR • Annual revenues from pellets sales: 480.000 EUR (80 EUR/t) • Annual operating profit: 150.000 EUR Energy from the biomass

  19. Prospects for the future • EU target: 12% energy from RES by 2010 • Polish Strategy for Development of Renewable Energy Sources sets following targets: • 7,5% energy from RES by 2010 • 14% energy from RES by 2020 • Biomass = over 90% RES in Poland Energy from the biomass

  20. Comparison of different energy generation systems in family houses Energy from the biomass

  21. Risks • Grant for the project not awarded RE: search for additional investors • Incompetitiveness of bio-fuel on the Polish market RE: focus on foreign markets, search for pellets consumers • Lower than expected productivity of Sida hermaphrodita plantation RE: supplementing Sida biomass with waste wood or other energy plants Energy from the biomass

  22. Future developments (1) • Establishing a network of local pelleting plants (1-2 t/h) combined with a system of Sida hermaphrodita plantations • Pellets for the individual use (family houses) • Segi-KGHM partnership as a pilot project • model system for the production of renewable energy from the biomass • Searching for investors for projects based on a similar scenario Energy from the biomass

  23. Future developments (2) • In the long run: developing pellet market • Modernisation of small district heating systems (power of several MW) as well as heating plants (200 kW - 1 MW) in industrial plants and public utilities (schools, hospitals etc.) • Package offer: heating plant for pellets + continuous supply of fuel • Looking for partners offering technologies of pellets’ combustion to apply in such heating plants Energy from the biomass