1 / 6

VMF Issues for ACCB 05-2

VMF Issues for ACCB 05-2. Topics. Category Markings on VMF Message Description Pages Restructure of URN Number for Rev “B” Overlay Message and Symbology. Category Markings on VMF Message Description Pages.

oshin
Download Presentation

VMF Issues for ACCB 05-2

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. VMF Issues for ACCB 05-2

  2. Topics • Category Markings on VMF Message Description Pages • Restructure of URN Number for Rev “B” • Overlay Message and Symbology

  3. Category Markings on VMF Message Description Pages • VMFSG Reacting to comments that the category markings were inconsistent and causing confusion to implementers • Army assigned an Action Item to propose a solution. Army solution is documented in ICP AV05-059. • Removes the “M” category from the standard • Removes all syntax marking • Redefines what “X” means

  4. Restructure of Unit Reference Number • Concern is that the current URN field will require modification to meet coalition needs • Goal is to restructure the URN field to meet all future needs and simply the URN management process • Two proposals are under study • Insert a “Nationality” field and tie it to the current 24 bit number. • Alternate solution is to define a “REGEX” expression that would be a composite field such as Target Number is to denote Nationality and number.

  5. Overlay Message and Symbology • Overlay Message Re-design • The re-design is an attempt to tighten the mapping between the fields in the VMF message and the requirements of MIL-STD-2525. • Lays out the symbols by category (Units, equipment, etc.). • Symbology - Discussion • Army CCB role in coordinating SSMC change proposals.

  6. VMF ICP Processing Status SEP OCT NOV DEC JAN FEB MAR APR VMF Subgroup 05-3 Draft ICPs (~ 24 ) ROAD TO MIL-STD-6017A 53 ICPs Approved as of JCCB 05-2 ~ 24 ICPs Forwarded from VMFSG 05-3 13 New Army ICPs from ACCB 05-2 About 80 VMF ICPs will be incorporated into MIL-STD-6017A anticipated for release 1 April 2006. (~ 10 ) (~ 14 ) VMF SG 05-3 VMF SG 05-4 JMCCB 05-3 ARMY CCB 05-2 ( 13 ) MIL-STD-6017 Comment Resolution Meeting MIL-STD-6017A Release New Army ICPs (~ 36 ) VID (SWB-3) VMF ICPs Approved as of JCCB 05-2 ( 53 ) ( 75 - 85 Approved VMF ICPs ) MIL-STD-6017 Preparation

More Related