870 likes | 1.16k Views
Today’s Challenge , Tomorrow’s Reward 2011 TCTR DBE Conference Upcoming Lettings By District. Construction Opportunities Work Types Examples. Patching Electrical Traffic Signals Detector Loops Traffic Control Landscaping Sidewalks Pavement Markings Curb and Gutter Storm Sewer
E N D
Today’sChallenge, Tomorrow’sReward 2011 TCTR DBE Conference Upcoming Lettings By District
Construction OpportunitiesWork Types Examples • Patching • Electrical • Traffic Signals • Detector Loops • Traffic Control • Landscaping • Sidewalks • Pavement Markings • Curb and Gutter • Storm Sewer • Drainage Adjustments • Trucking • Tree Removal • Steel Fabrication • Rebar • Guardrail • Fencing
DBE OPPORTUNITIES If your company needs help in accessing information concerning contract opportunities and certification requirements for becoming recognized as a DBE firm, please contact the IDOT staff at: Small Business Enterprises Office of Business & Workforce Diversity 2300 Dirksen Parkway, Springfield (217) 782-5490
DBE OPPORTUNITIES If your company needs help in accessing information concerning pre-qualification as a prime contractor, please contact: Michael Copp Bureau of Construction Pre-qualification Section 2300 Dirksen Parkway, Springfield, IL (217) 782-3413 IDOT Resource Center 900 South Des Plaines Ave Chicago, IL (312) 939-1100
DISTRICT EEO OFFICERS DISTRICT 7John ShrumState Highway BuildingEffingham, IL 62401-2699Phone - (217) 342-3951 DISTRICT 8Lee Coleman1100 Eastport Plaza DriveCollinsville, IL 62234-6198Phone - (618) 346-3100 DISTRICT 9Delores SmithState Highway BuildingP.O. Box 100Carbondale, IL 62901-0100Phone - (618) 549-2171 • DISTRICT 4Kati Bailey401 Main StreetPeoria, IL 61602-1111Phone - (309) 671-3333 • DISTRICT 5Ron BrownState Highway BuildingRoute 133 West, P.O. Box 610Paris, IL 61944-0610Phone - (217) 465-4181 • DISTRICT 6John Green (Acting)126 East Ash StreetSpringfield, IL 62706-4766Phone - (217) 524-2132 • DISTRICT 1Patti Walker (Acting)201 West Center CourtSchaumburg, IL 60196-1096Phone – (847) 705-4464 • DISTRICT 2 • Fred Marruffo819 Depot AvenueDixon, IL 61021-3546Phone - (815) 284-2271 • DISTRICT 3Marco Maury700 East Norris DriveOttawa, IL 61350-0697Phone - (815) 434-6131
DBE OPPORTUNITIES • The following contracts have been tentatively identified and are expected to be advertised on the scheduled lettings for March, April, and June 2011. • These contracts will be presented by Region in District order.
Illinois Department of Transportation Division of Highways, Region One – District One Cook County (including the City of Chicago) DuPage County Kane County Lake County McHenry County Will County
Engineering OpportunitiesConstruction Supervision US 20 (Lake Street) over McLean Boulevard IL 38 (Roosevelt Rd.) at UP Railroad and Kautz Road I-80 from Grundy County Line to US 30 IL 62 (Algonquin Road) : Eastings Way to Penny Road Various Construction Engineering for Bridge Painting Contracts
Engineering OpportunitiesPreliminary Engineering(PTB 159) • US 45: IL 60 (Townline Road) to north of IL 22 – Phase II • Various Local Roads Program Management – Phase I/II • US 30: IL 47 to Albright Road – Phase I • Various Project Studies Consultant – Phase I • IL 53: IL 64 (North Avenue) to St. Charles Road – Phase II • US 45: Rollins Road to Washington & @ IL 132 – Phase II • Various Structure Plan Preparation – Phase II • Various Quality Assurance Quality Testing – Phase II
Engineering OpportunitiesPreliminary Engineering (continued) Various Miscellaneous Survey Work – Phase I (two contracts) Various Miscellaneous Survey Work (ROW) – Phase I Willow Road over Lehigh Avenue & Soo Railroad – Phase II
Construction OpportunitiesMarch through June 2011 Lettings Resurfacing Projects • Interstate Resurfacing Projects (including bridge repairs): • I-55 – County Line Rd to Kedzie Avenue • I-55 e/o I-355 to County Line (shoulder resurfacing) • I-80 – Grundy Co. Line to Midland Ave. (EB) • I-80 – Grundy Co. Line to Midland Ave. (WB) • I-80 – Midland Ave. to W. of US 30 (EB) • I-80 – Midland Ave. to W. of US 30 (WB) • Total = $86,000,000 • Arterial Resurfacing Projects: • 20 Contracts ($300,000 to $3,100,000) • Average Contract = $1,245,100 • Total = $24,902,000
Construction OpportunitiesBridge Rehabilitation Projects 9 contracts ($125,000 to $11,317,000) Bridge Repair – Bridge Replacement – Bridge Deck Sealing - Bridge Approach Roadways - Bridge Deck Overlay – Bridge Deck Repair - Bridge Joint Repair Total = $19,392,000 Construction OpportunitiesInterchange Reconstruction Interstate Route 55 at Arsenal Road Interchange & Bridge (New) - $41,000,000 Interstate Route 55 @ Central Ave. & Ramps - Interchange Reconstruction & Bridge Rehabilitation - $40,000,000 Total = $81,000,000
Construction OpportunitiesAdditional Lane Projects US 30: Briarcliff Rd. to US 34 – Add Lanes, Bridge Rehab., - $25,478,000 US 30: W. of IL to East of BN RR – Add Lanes, Interchange Reconstruction, Bridge Rehab., Traffic Signal Modernization - $21,330,000 IL 21: S. of IL 120 to IL 137 – Add Lanes, Bridge Replacement - $25,000,000 IL 53: Elgin O’Hare Expressway to Army Trail Road – Add Lanes, Bridge (New) - $47,000,000 IL 62: Eastings Way to Penny Road – Add Lanes, Reconstruction - $14,000,000 IL 64: Kautz Road to IL 59 – Add Lanes, Bridge Replacement - $37,000,000 IL 64: 7th Ave. to Dunham Road – Reconstruction, Widening & Resurfacing, RR Crossing Improvement - $10,000,000 TOTAL: $179,808,000
IL 19 @ York - $4,000,000 Advance Work for $50M Grade Separation ProjectIL 38 @ Kautz – Grade Separation$33,008,000Total: $37,008,000 Grading Projects Algonquin Bypass - $15,500,000Advance Work for the $55,000,000 Main Contract Construction OpportunitiesGrade Separation Projects
Construction Opportunities Operation Improvement and Safety Projects: Pedestrian Overpass, Milled Rumble Strips, New Shoulders, Guard Rail End Section, Replacement, Pavement Marking, Signing, Guardrail, Channelization, Intersection Improvement, Traffic Signal Installation, Pedestrian Signals, Impact Attenuators, Lighting, Sidewalks, RR Relocation, Protective Shielding, Shoulder Repair = $20,898,000 ($162,000 - $5,690,000) Miscellaneous Improvements: Fencing, Tree Removal, Landscaping, Demolition, Noise Barriers, Wing Wall Repair, Retaining Wall, Drainage, Knee Wall, Signing, Culvert Replacement, Concrete Barrier Wall and Parapets, Center to Center Integration, sidewalks = $7,226,000 ($105,000 - $2,821,000) Total = $28,124,000
Jo Daviess Stephenson Boone Winnebago Carroll Ogle Dekalb Lee Whiteside Kendall Bureau Rock Island LaSalle Henry Grundy Kankakee Livingston District 2 Iroquois Ford District 3 REGION 2 Districts 2 & 3 Eric S. Therkildsen, P.E. Acting Regional Engineer
MARCH, APRIL & JUNE 2011 LETTING OPPORTUNITIES DISTRICT 2 • District 2 is comprised of 10 counties in Northern Illinois and includes the cities of Dixon, Freeport, Moline & Rockford • There are tentatively: • 15 contracts on the March 11th Letting • 14contracts on the April 29th Letting • 5 contracts on the June 17th Letting
District 2 March April June 2011 Lettings
DISTRICT 2 MARCH LETTING
DISTRICT 2 MARCH LETTING
DISTRICT 2 MARCH LETTING
DISTRICT 2 APRIL LETTING
DISTRICT 2 APRIL LETTING
DISTRICT 2 APRIL LETTING
DISTRICT 2 JUNE LETTING
2011 LETTING OPPORTUNITIES DISTRICT 3 • District 3 is comprised of 9 counties in northern Illinois and includes the cities of Ottawa, Kankakee, DeKalb & Sycamore • There are tentatively: • 9 contracts on the March 11th Letting • 6 contracts on the April 29th Letting • 2 contracts on the June 17th Letting
District 3 March Letting
District 3 March Letting
District 3 April Letting
District 3 June Letting
Region 3 Mercer Putnum Stark Marshall Knox Warren Henderson Peoria Woodford Fulton Tazewell McLean McDonough Vermilion Dewitt Champaign Piatt Douglas Edgar District 4 District 5 Districts 4 & 5 Joseph E. Crowe, P.E. Regional Engineer
2011 LETTING OPPORTUNITIES DISTRICT 4 • District 4 is comprised of 12 counties in west central Illinois and includes the Peoria Metropolitan Area and the cities of Canton, Chillicothe, Macomb, Monmouth, Galesburg & Peoria • There are tentatively (includes local agency contracts): • 9contracts on the January 25thLetting • 4 contracts on the February 25thLetting (Target Market) • 10 contracts on the March 11th Letting • 8 contracts on the April 29th Letting • 9 contracts on the June 17th Letting
District 4 March April June 2011 Lettings
District 4 March Letting
District 4 March Letting
District 4 April Letting
District 4 April Letting
District 4 June Letting
District 4 June Letting
2011 LETTING OPPORTUNITIES DISTRICT 5 • District 5 is comprised of 7 counties in East Central Illinois and includes the cities of Danville, Champaign-Urbana & Bloomington-Normal • There are tentatively: • 10contracts on the March 11th Letting • 18contracts on the April 29th Letting • 2contracts on the June 17thLetting
District 5 March April June 2011 Lettings
District 5 March Letting
District 5 March Letting
District 5 April Letting
District 5 April Letting
District 5 April Letting
District 5 June Letting
District 6 District7 REGION 4 Hancock Mason Schuyler Logan Menard Adams Brown Cass Macon Morgan Sangamon Moultrie Pike Scott Coles Christian Shelby Clark Macoupin Cumberland Montgomery Effingham Jasper Fayette Crawford Lawrence Clay Richland Districts 6 & 7 Roger L. Driskell, P.E. Regional Engineer Wabash Wayne Edwards
MARCH, APRIL & JUNE 2011 LETTING OPPORTUNITIES DISTRICT 6 • District 6 is comprised of 15 counties in West Central Illinois and includes the cities of Quincy, Jacksonville, Lincoln & Springfield • There are tentatively • 5contracts on the March 11th Letting • 12contracts on the April 29th Letting • 13contracts on the June 17thLetting
District 6 March Letting