1. MUWG- Winter 08
Breakout Session 2A
Standardizing Job Plans
And Preventive Maintenance
for
Optimizing Programs
2. Objectives:
Information exchange
Understand the importance of Job Plans and why it is important to standardize where possible
Review basic rules for PMs to enable an optimization program to be applies
3. PREVENTIVE MAINTENANCEJOB PLANS JOB PLAN PHILOSOPHY
Establish When Job Plan is required
Define How Job Plan is used
Determine Skill level for Plan
Establish Labor Estimating Policy
Address Material/Parts Requirements
Determine How Safety and Environmental issues are addressed
Establish Job Plan Controls NOTES:____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________NOTES:____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
4. PREVENTIVE MAINTENANCEJOB PLANS When is a Job Plan Required?
All PMs
All Work on Critical Equipment
All Work that requires Materials/Parts
All Work that requires pre-job briefing
All Work that requires Lock-out
All Work that requires multiple crafts
All Work that uses hazardous materials
All complex work
All equipment overhauls/rebuilds NOTES:____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________NOTES:____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
5. PREVENTIVE MAINTENANCEJOB PLANS ESTABLISHING WORK CONTENT:
Determine how safety and pre-job briefing will be handled
Content of Steps and level of detail
Tools, tolerances, precautions
When to assign time to each step
When to reference a procedure or technical manual for the work
Rules for equipment restoration
Rules for post maintenance testing NOTES:____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________NOTES:____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
6. PREVENTIVE MAINTENANCEJOB PLANS ESTABLISHING Naming and Numbering:
Important to understand why and how Job plan naming and numbering fits into the work of a Planner
Auto number - keep JPs at Org level
Naming should allow for associating work content with asset or asset class
Naming should define magnitude of work
Do not assign priorities to JPs NOTES:____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________NOTES:____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
7. PREVENTIVE MAINTENANCEJOB PLANS JOB PLAN LABOR ESTIMATING RULES:
All job plans have labor estimates
Labor Estimating Business Rules
What parts of the job are included/excluded from labor estimates
Travel
Getting instructions
Getting parts
Breaks
Getting Clearances
Job Site Clean-up/restoration
NOTES:____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________NOTES:____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
8. PREVENTIVE MAINTENANCEJOB PLANS Labor Estimating Business Rules
Basis for labor estimates
Past performance from actual time reporting
Industry or peer experience
Internal experienced based
Engineered standards
Published standards
Define who approves work plan estimates and how and when to adjust them
Include duration
NOTES:____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________NOTES:____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
9. PREVENTIVE MAINTENANCEJOB PLANS Labor Estimating Business Rules
Labor Requirement Rules
Assigning correct number of craft by skill
Lead Craft/Crew/Supervisor
Minimum Craft Skill Level
When to relate Craft to Operational Steps
Establishing Labor/Craft Rates (loaded, unloaded)
NOTES:____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________NOTES:____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
10. PREVENTIVE MAINTENANCEJOB PLANS Job Plan Material Rules
All PM Job Plans that require material should have stock or nonstock material (item number)
Direct Issue Material
Consumables and shop spare need to be in the plan or listed as materials
Stock , Non-stock and Special Issue
NOTES:____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________NOTES:____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
11. PREVENTIVE MAINTENANCEJOB PLANS Job Plan Tool Support
Assumes Standard tools available to crafts
Listing special tools in the operational step
List tools on “Tool Tab” that are listed in the “Resource – Tool” Application
Tools that should be scheduled
Typically Major tools that are shared such as cranes NOTES:____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________NOTES:____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
12. PREVENTIVE MAINTENANCEJOB PLANS Safety Plans, Hazards, Precautions
Need to set up rules when to use Safety Plan or include in basic Job Plan
Generally list safety hazards and precautions that are above the normally accepted practice for safety
Should be used in pre-job briefing and printed on Work Order NOTES:____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________NOTES:____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
13. PREVENTIVE MAINTENANCEJOB PLANS Job Plan Summery
Well developed Job Plans improve Worker Productivity and Work Quality
Need to have well defined rules to ensure Job Plan consistency and quality
Job Plan feedback from crafts is essential for a continuous plan improvement NOTES:____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________NOTES:____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
14. PREVENTIVE MAINTENANCEJOB PLANS Preventive Maintenance
PMs are designed to:
Mitigate failures for critical assets
Extend life of assets by performing periodic maintenance
Ensure regulatory actions for systems or assets are performed to schedule
Perform routine tasks associate with good maintenance practices
PMs are not:
Administrative task
Calendar reminders NOTES:____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________NOTES:____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
15. PREVENTIVE MAINTENANCEJOB PLANS Preventive Maintenance Optimization
Evaluation process to use data from Maximo to adjust PM frequency and work content for the purpose of lowering cost of maintenance without imposing additional risk to the business performance
Requires that PM program have rules that enable maintenance staff (engineer) to make program adjustments
NOTES:____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________NOTES:____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
16. PREVENTIVE MAINTENANCEJOB PLANS Preventive Maintenance Naming and Numbering
Naming PM is essential for analysis and provides for standardization – Names should include:
Asset name or asset class
Magnitude/Scope of work
Description of work
Sub work type
Regulatory
Production
Safety
Environmental NOTES:____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________NOTES:____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
17. PREVENTIVE MAINTENANCEJOB PLANS Preventive Maintenance Naming and Numbering
PMs should be auto numbered
PMs should be associated with assets where possible and locations if assets are not specific to the location
Remember that PMs are at the site level NOTES:____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________NOTES:____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
18. PREVENTIVE MAINTENANCEJOB PLANS Preventive Maintenance Optimization
Maximo set up requirements to help with PM performance analysis
Asset priority system that evaluates asset failure probability and consequence
Asset Classifications that allow for system wide analysis to eliminate random failure data
Failure reporting system codes
The use of Follow up work orders for corrective maintenance that result from PM activity
NOTES:____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________NOTES:____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________