130 likes | 302 Views
~ 38%. THE CONTRIBUTION OF INFN TO WP5 Presented by M.Anghinolfi, INFN-Genova (It). participation within INFN:. CNR R/V Urania 62 m. CNR R/V Thetis 32 m. Capo Passero 3350 m Ustica 3500 m Alicudi 3500 m Catania 2000 m. NATO R/V Alliance 110m.
E N D
~ 38% THE CONTRIBUTION OF INFN TO WP5 Presented by M.Anghinolfi, INFN-Genova (It) KM3NeT kickoff meeting
participation within INFN: KM3NeT kickoff meeting
CNR R/V Urania 62 m CNR R/V Thetis 32 m Capo Passero3350 m Ustica 3500 m Alicudi 3500 m Catania 2000 m NATO R/V Alliance 110m Some previous experience. . .Sites investigated, ships CONISMA R/V UNIVERSITATIS 48m KM3NeT kickoff meeting
AC9 AC9 Biofouling Sediments Optical background NEMO Site Selection Activity > 25 sea campaigns since 1998 • light transmission propertiesof deep sea water(AC9 transmissometer) • optical background(custom devices) • deep sea currents(RCM11 and RCM8 current metre) data analysisOGS • nature and quantity ofsedimenting material(Sediment trap) dataanalysis IBM • seabedcharacteristics (cores and bottom profile) dataanalysis CEOM-ENI Other sites explored Lake Baikal, in collaboration with BAIKALsite evaluation group Toulon(ANTARES site), in collaboration withANTARESsite evaluation group V. Balkanov et al. NIM 2002 KM3NeT kickoff meeting
Oceanographic data measured in Capo Passero Two current metres and a sediment trap are moored in Capo Passero Region since 1998. Current metre 2900 m Sediment trap 3000 m Current meter 3050 m Seabed 3350 m KM3NeT kickoff meeting
Capo Passero: sedimentation rate Etna eruption July 2001 KM3NeT kickoff meeting Sediment samples collected over more than 3full years: Aug 1999-May 2000 and July-December 2001(analysed). Other periods under analysis
Joint Sea Campaign ANTARES-NEMO Detector: PMT (10” Hamamatsu) Test 1 CPU and memory (160Mb) Energy ( > 350 h) KM3NeT kickoff meeting
Optical background in Capo Passero and Toulon PMT 1+ DAQ NEMO device(8’’ PMT at 0.3 spe) • Toulon 58.03.0 kHz • Capo P. 28.52.5 kHz PMT 2+power PMT dark current 7 kHz PMT dark current 7 kHz KM3NeT kickoff meeting
power distribution (See M. Sedita VLVnT II , Catania nov 05) KM3NeT kickoff meeting
JUNCTION BOX Design and realization of power electrical and control systems for underwater deep sea networks Test and applications of power electric and electronics components under pressure Facilities and instrumentations for under pressure tests of working electric and electronic components (See R.Cocimano VLVnT II , Catania nov 05) KM3NeT kickoff meeting
deployment and recovery of detector units (See M. Musumeci VLVnT II , Catania nov 05) KM3NeT kickoff meeting
developement of a new hybrid electro optical • wet-mateable connector (proposed by S.Cuneo INFN Genova) KM3NeT kickoff meeting