210 likes | 331 Views
Hospitality Division. Prefab Panel System. Luxury Bath and Flooring. PREFAB PANEL. Aluminum Honeycomb. Aluminum Sheet. Aluminum Sheet. Natural marble. Prefab Panel with Honeycomb Backing Usage: Wall Panel, Cladding, Curved Panel. PREFAB PANEL. Prefab Panel with Fiberstone Backing
E N D
Hospitality Division Prefab Panel System Luxury Bath and Flooring
PREFAB PANEL Aluminum Honeycomb Aluminum Sheet Aluminum Sheet Natural marble • Prefab Panel with Honeycomb Backing • Usage: Wall Panel, Cladding, Curved Panel
PREFAB PANEL • Prefab Panel with Fiberstone Backing • Usage: Floor Panel, Pattern flooring, high-strength requested
SYSTEM ADVANTAGES • Light-weight panels • Ease handling for semi-skilled workers • Watertight • Suitable for shower & bath • Adapt to your design vision. • More stone choices to use such as limestone, sandstone, marble, granite & onyx • Match with site tolerances • Proven high speed production • 300 bathrooms per month
INSTALATION ADVANTAGES • Major work done in factory • Reduce Site work • Fast installation • Improve workmanship • No wet work on site • No waste/debris on site
ECONOMICAL ADVANTAGES • Early back to business • Short installation lead time • Clean & Quiet site • Renovation along with normal business operation is possible • Better Quality • Highest standards of workmanship • Easily retrofitted • Save building cost • Less building weight (Only drywall needed) • Less natural stone used • Less site debris • Less experienced labor required • Less transportation cost
SITE INSTALLATION Bath Tub & Frame
FINISHED PROJECT: • Macau Ponte 16 Resort • Installation of 404 bathrooms in just 48 days. • Product Used: Prefab with honeycomb; wall & flooring • Comparison • Conventional Method: • 160 Skilled Workers • 50 Cleaners • Prefab System: • 40 Semi-Skilled Workers • 8 Skilled Workers • 10 Cleaners
FINISHED PROJECT: • Singapore Marina Bay Sands • Installation of 2797 bathrooms in just 69 days. • Product Used: Prefab with honeycomb; wall & flooring • Comparison • Conventional Method: • 762 Skilled Workers • 60 Cleaners • Prefab System: • 122 Semi-Skilled Workers • 61 Skilled Workers • 20 Cleaners
FINISHED PROJECT: • Venetian, Macau • Installation of 1,200 m2 Waterjet Pattern in just 15 days. • Product Used: Prefab panel with fiberstone; flooring • Comparison • Conventional Method: • 10 Skilled Workers • 2 Cleaners • Prefab System: • 2 Semi-Skilled Workers • 2 Skilled Workers • 1 Cleaners
MORE PREFAB STONE PRODUCTS • 1.5 mm thk Slate Veneer • 3 mm thk semi transparent Onyx Panel • Floor / Wall Panel • Patterns or Inlays • Hairline / 1 mm Joint • Shower Panel • Curved Panel • 1/5 weight to original 30mm stone
For more information visit us at:www.terracorepanels.com 2030 Irving Blvd Dallas, Texas 75207 (214) 749-0999