1 / 19

Electric and Magnetic Fields

Electric and Magnetic Fields. W. Morse BNL. FN Field Emission Current vs. E. Recent Progress from LC/ERL R&D (5mm gap tests) Cornell/JLab. High Pressure Water Rinsing. Gap Spacing - 1990. How to Scale HPWR to 3cm gap?. Cornell. 2011 Cornell Goal. PEDM Goal. 2010 Cornell.

ozzie
Download Presentation

Electric and Magnetic Fields

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Electric and Magnetic Fields W. Morse BNL W. Morse PEDM Review

  2. FN Field Emission Current vs. E W. Morse PEDM Review

  3. Recent Progress from LC/ERL R&D (5mm gap tests) Cornell/JLab W. Morse PEDM Review

  4. High Pressure Water Rinsing

  5. Gap Spacing - 1990

  6. How to Scale HPWR to 3cm gap? Cornell 2011 Cornell Goal PEDM Goal 2010 Cornell W. Morse PEDM Review

  7. Contingency Plan Less stored beam Increase Ring Radius (>straights)

  8. Electrode Shape Equi-potential Surface.  = 0.20  0.02 for SCT.  0.02 is for no sextupoles. 0.10 with sextupoles.

  9. Sagitta = (1806)m for 0.02 30m for 0.1 0.2mm 10cm

  10. R&D First E Module

  11. First E Module Timeline W. Morse PEDM Review

  12. Start date set arbitrarily to Jan 1. W. Morse PEDM Review

  13. Canceling Earth’s Magnetic Field Need factor 3108 shielding. Outside active. Cancel field at surface of passive shield. Passive = 105 for 6M$ delivered (not installed). Inside active. Make CW/CCW bpms read the same.

  14. Inside Active Feed-back Every 103s? Plot for 104 runs: dS/dt* = B* + dE* dS_y <B_r> edm

  15. Conclusions PEDM E spec is under the HPWR curve = low technical risk. Contingency plan: reduce gap and/or increase bending radius. Need to increase bending radius anyhow if straights are not long enough. Shielding earth’s B field = low technical risk. Contingency plan: go from 4 to 5 layers for several M$ more.

  16. Extra Slides W. Morse PEDM Review

  17. Large Scale Electrodes W. Morse PEDM Review 17

  18. Tevatron pbar-p Separator Module W. Morse PEDM Review 18

  19. HV Feedthrough to 0.2m High Electrodes W. Morse PEDM Review 19

More Related