3rd Results- Based M&E Workshop. 3 rd APCoP-MfDR Results-Based M&E Workshop Summary of the Capacity Gaps and Actions on the M&E Attributes Ballroom 1 Intercontinental Hotel Phnom Penh, Cambodia 28-30 June 2011. Results-Oriented M&E Workshop. MOP.
E N D
3rd Results- Based M&E Workshop 3rd APCoP-MfDR Results-Based M&E Workshop Summary of the Capacity Gaps and Actions on the M&E Attributes Ballroom 1 Intercontinental Hotel Phnom Penh, Cambodia 28-30 June 2011 Institutionalizing M&E System in Cambodia
Results-Oriented M&E Workshop MOP Institutionalizing M&E System in Cambodia
Summary of Capacity Development Gaps • No M & E forms/guidelines • No M & E database • No feedback mechanism • Officials in-charge lack of necessary skills • No single and harmonized M&E system for MoP and LMs/LAs.
Actions to be taken • Establish computerized M&E database and paper-based M&E forms • Strengthen the existing M&E unit in LMs/LAs • Build capacity of the M&E officials in MoP (short-term and long-term trainings) • Report to the leaders of MoP about ADB M&E initiative for Cambodia.
Results-Oriented M&E Workshop MRD Institutionalizing M&E System in Cambodia
Results-Oriented M&E Workshop Welcome to the 3rd APCOP-MfDR Results-Based M&E Workshop for Rural Development Ministries in Cambodia Session 3 : Identifying Capacity Development Gaps and Actions for Institutional Logframe Institutionalizing M&E System in Cambodia
Results-Oriented M&E Workshop Logframe Review: Goal ; purpose; objective… Institutionalizing M&E System in Cambodia
Results-Oriented M&E Workshop Welcome to the 3rd APCOP-MfDR Results-Based M&E Workshop for Rural Development Ministries in Cambodia Session 5 : Identifying Capacity Development Gaps and Actions for Data Quality Assessment, Analysis and Reporting Institutionalizing M&E System in Cambodia
Results-Oriented M&E Workshop Indicator identification; methodology; analysis and reporting Institutionalizing M&E System in Cambodia
Results-Oriented M&E Workshop Welcome to the 3rd APCOP-MfDR Results-Based M&E Workshop for Rural Development Ministries in Cambodia Session 7 : Identifying Capacity Development Gaps and Actions for Evaluation Designs, Methodology and Approaches Institutionalizing M&E System in Cambodia
Results-Oriented M&E Workshop Evaluation designs or models determined Institutionalizing M&E System in Cambodia
Results-Oriented M&E Workshop Welcome to the 3rd APCOP-MfDR Results-Based M&E Workshop for Rural Development Ministries in Cambodia Session 8 : Identifying Capacity Development Gaps and Actions for Feedback Mechanism Institutionalizing M&E System in Cambodia
Results-Oriented M&E Workshop Feedback questionnaires for key stakeholders development and preparation of an effectiveness and efficiency of projects/program recorded. Institutionalizing M&E System in Cambodia
Results-Oriented M&E Workshop MAFF Institutionalizing M&E System in Cambodia
M&E Core Attribute 5: Determining Capacity Gaps in developing Institutional Logframe 1-Program or Project goals are clearly stated (ASDP, BST…) 2-Linkage between activities, results, purpose and objectives of the program, project, or policy in a hierarchy indicated (Some line Departments not link to ASDP) 3- The 4 x 4 (Four by Four) Matrix showing the methodical manner and causal logic developed (Need correction
M&E Corel Attribute 6: Determining capacity gaps in completing Data Quality Assessment, Analysis and Reporting 1-Quantitative and or qualitative analysis designs utilized (Statistic office) 2- Statistical measures in quantitative data used 3- Reports published or shared (Annual Conference)
M&E Corel Attribute 7: Identifying capacity development gaps in Evaluation Designs, Methodology and Approaches 1- Evaluation designs or models determined (Form in MAFF’s manual) 2- Sampling methodologies identified (Statistic office) 3- Changes in interventions documented
M&E Corel Attribute 8: Feedback mechanism 1-Feedback questionnaires for key stakeholders developed (Site Visit) 2-Feedback from stakeholders available in customized e-portals or other forms of information sharing mechanism (Software-Hardware equipment, Training)
Results-Oriented M&E Workshop MOWRAM Institutionalizing M&E System in Cambodia
Summary of Capacity Development Gaps • M & E forms/guidelines not available • No M & E database • Capacity building for staff to perform M&E • Indicators not harmonized