Planning and Design Considerations For a 4G LTE Network

Planning and Design Considerations For a 4G LTE Network. 2012 ACE/RUS School and Symposium. Presented by: Engineering Associates, Inc. Professional Engineering Firm. Previous Speakers with Wireless Topics. Leo Zoucha Connecting in the Wireless Networks (Backhaul) Don Swedenburg

pabla
Download Presentation

Planning and Design Considerations For a 4G LTE Network

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Planning and Design Considerations For a 4G LTE Network 2012 ACE/RUSSchool and Symposium Presented by: Engineering Associates, Inc. Professional Engineering Firm

  2. Previous Speakers with Wireless Topics • Leo Zoucha • Connecting in the Wireless Networks (Backhaul) • Don Swedenburg • Will LTE be the Death of the Landline? • Gordon Caverly, Ben Pidek • Wireless Video in the Home

  3. Overview • Funding Options • Design Criteria • Technology Considerations • Frequency Bands • Core Design • RF Design - RAN • Backhaul Considerations • Bandwidth Efficiency & Traffic Planning • Investment/Pricing Models

  4. Funding Options • Connect America Fund • Universal Service Fund transitioning to Connect America Fund • Objective is to Accelerate Broadband Build-Out in Rural Areas • Additional $300M of CAF Funding Available to Incumbent Providers that Commit to FCC Broadband Requirements for Unserved Areas • 4 MB/s Downstream; 1 Mb/s Upstream • Remaining Areas to Receive CAF Money Based Upon Broadband Cost Models and Competitive Bidding

  5. Funding Options • RUS Broadband Loans • Provides Funds to Provide Broadband Service in Eligible Rural Areas • Includes New Construction, Improvements, and Acquisition • No More than One Loan Awarded per Service Area • Broadband Grants • Funding is Ongoing but Application Process has Ended • Additional Funding Would Require New Legislation

  6. Design Criteria • Which Spectrum Licenses are Available? • Is Coverage Area Urban or Rural? • Are Existing Towers Available or Will Tower Construction be Required? • Applications - Fixed Solution vs. Mobility? • CPE – Outdoor, USB Desktop, Dongle, or Handsets • What Backhaul Options are Available? • Product Availability and Number of Vendor Options? • Ensure Design Reflects Goals for Geographic Coverage and Broadband Speed?

  7. 700 MHz Band Plan 700 MHz – Lower Band 48 MHz; Upper Band 60 MHz Most Blocks are 6 MHz, Allowing 5 MHz LTE Carrier 35% Build-Out Required by June 13, 2013 for A,B, & E 40% Build-Out Required by June 13, 2013 for Upper C

  8. 700 MHz Details • Block A – 12 MHz Lower Band Paired • Block B – 12 MHz Lower Band Paired • Block C – 12 MHz Lower Band Paired and 22 MHz Upper Band Paired • Block D – 6 MHz Lower Band Unpaired (Video) and 10 MHz Upper Band Paired (Public Safety) • Block E – 6 MHz Lower Band Unpaired (Video)

  9. 700 MHz Spectrum Ownership • Verizon – 22 MHz Upper C Block Nationwide (except Alaska and U.S. Territories) and Scattered Lower A and B Blocks • AT&T – Scattered Lower B and C Blocks (Mostly Metro Areas); Purchasing Unpaired Lower D Block Nationwide and Unpaired E Block in some Major Markets from QualComm (for LTE Use) • Sprint – No 700 MHz • T-Mobile – No 700 MHz • Regional Carriers – Lower B and C Blocks (Mostly Rural) • Public Safety – 10 MHz Upper D Block

  10. AWS Band Plan AWS – Advanced Wireless Service; 1.7 GHz; 2.1 GHz Blocks are 6 or 10 MHz, Allowing 5 or 10 MHz LTE Carrier Substantial Service Build-Out Deadline is 2021

  11. PCS Band Plan PCS – Broadband Radio Service; 1.9 GHz

  12. BRS/EBS Band Plan BRS – Broadband Radio Service; 2.6 GHz • EBS (Educational Broadband Service) was not licensed for commercial services, although its use has been postulated for LTE in some markets. • Due to current Band 7 ecosystem using FDD, BRS is of limited use until Band 41 TDD ecosystem becomes reality.

  13. RF Design - RAN • Using RF Analysis Tool, Determine Predicted Coverage Levels and Aggregate Speeds Based Upon Technology and CPE Selection • Utilize Various GIS Data To Evaluate Possible Tower Sites • Select First Choice Tower Locations in Populated Areas • Select Additional Tower Locations to Fill in Rural Areas • Identify Areas Where New Towers May Be Required • Generate Site Search Rings When Necessary • Analyze Results and Add or Delete Sites as Required

  14. Service Area Of Interest • Network Planning / Design Tools-GIS Software • E911 Location Data • Highway/Street Traffic Count Vector Data • Minimum UL/DL Throughput Requirements • Network Resource Locations

  15. Propagation Tools • Propagation Software Tools • Integrated With GIS Software • Target to Customer Design • Backhaul (Microwave) Feasibility Tool • Operations Reports to Assist with Customer Service

  16. Shaded Relief Showing Topography of Area

  17. E911 Points for Potential Locations • Evaluate Network Objective • Percentage of Projected Coverage Area • Coverage of Major Thoroughfares • Ability For Sites To Be Contiguous • Fixed Locations and/or Mobile Devices • Network Parameters • Technology Type • Frequency Band(s) • Network Backbone/Backhaul

  18. Existing Cellular Coverage in Planned Service Area Coverage Objective for Planned Service Area

  19. Establish Search Area Ring (SAR)

  20. Search Area Ring (SAR) Description: Identify feasible sites for providing necessary coverage as to existing network. The SAR includes the following activities and deliverables: • Importing target coverage zones • Develop alternate search area rings Base map indicating: • RSA Boundaries • E911 addresses (When Necessary) • Existing Coverage • Contours • Topography • Roadways • Target and Propagation overlay demonstrating RF coverage as related to target zones for specified frequencies.

  21. Review Co-Location Possibilities

  22. Establish Site Location

  23. Projected Coverage in Planned Service Area • PERCENTAGE OF PROJECTED COVERAGE AREA • Coverage of Major Thoroughfares

  24. LTE Coverage Maps LTE Downlink (USB Dongle) 2Mbps to 8Mbps Four Towers with Five Mile Radius; Roughly 16 Miles x 16 Miles

  25. LTE Coverage Maps LTE Uplink (USB Dongle) 2Mbps to 6Mbps Four Towers with Five Mile Radius; Roughly 16 Miles x 16 Miles

  26. Backhaul • LTE demands high-capacity backhaul • Leased T1’s will prove inadequate • Viable choices are fiber or microwave

  27. Core Design • Design Core Network Based Upon Projected Number of Subscribers and Bandwidth Requirements • Is VoIP Required or Data Only? • Ancillary/OEM Solutions Needed • Billing • Network Management, • Subscriber Provisioning • Regulatory (E911, CALEA) • Identify Existing Equipment Required to Interface • Evaluate Building Feasibility Related to Redundant Backhaul Facilities, Security, and Back-up Power

  28. LTE Evolved Packet Core

  29. Technology Considerations • 700 MHz is Fundamental Design Based Upon Coverage; However, Bandwidth is Limited • Reserve 700 MHz for Rural Areas that Require More Reach but Serves Fewer Subscribers • Use AWS, BRS, or PCS for Capacity in Populated Areas with Shorter Reach

  30. LTE vs. WiMax • Although LTE and WiMAX are Similar in Technology, Vendors have Moved Development Emphasis to LTE • WiMAX has Less Vendor Competition Today • LTE will have Longer Product Life and Future Prices are More Likely to Decrease

  31. Technology Comparison

  32. Technology Comparison

  33. Bandwidth Efficiency * Performance data is averaged from various vendors’ claims as of 2011.

  34. Subscriber Traffic Model * Performance data is averaged from various vendors’ claims as of 2011.

  35. Estimate of Investment * Pricing data is averaged from various vendors’ proposals as of 2011.

  36. Pricing - Example Network #1 * Pricing data is averaged from various vendors’ proposals as of 2011.

  37. Pricing - Example Network #2 * Pricing data is averaged from various vendors’ proposals as of 2011.

  38. Pricing - Example Network #3 * Pricing data is averaged from various vendors’ proposals as of 2011.

  39. Summary - Start to Finish Process • Feasibility Study and Business Case • Preliminary RF/Backhaul Network Design • RFP Preparation, Proposal Analysis, and Contract Negotiation • Site Acquisition and Lease Negotiations • Permitting / Legal • Detailed RF/Backhaul Network Design • Project Management and Asset Management • Construction Management • As Built Drawings

  40. Thank You Engineering Associates, Inc. 1220 Old Alpharetta Road, Suite 390 Alpharetta, GA 30005 678-455-7266 engineeringassociates.com