1 / 8

Woodbridge School District Schematic Design for Woodbridge High School of Arts and Sciences

Woodbridge School District Schematic Design for Woodbridge High School of Arts and Sciences. 17 January 2012. Schematic Design. Building. Building Plans. First Floor Plan. Building Plans. Second Floor Plan. Perspectives. Rear. Front.

page
Download Presentation

Woodbridge School District Schematic Design for Woodbridge High School of Arts and Sciences

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Woodbridge SchoolDistrictSchematic Design forWoodbridge High Schoolof Arts and Sciences 17 January 2012

  2. Schematic Design Building

  3. Building Plans • First Floor Plan

  4. Building Plans • Second Floor Plan

  5. Perspectives • Rear • Front

  6. Woodbridge School DistrictTotal Project Cost Summary Building Construction Costs $ 46,470,770 Design & Consulting Fees $ 2,498,500 State, County, Local & Agency Fees $ 1,365,641 FF&E & Technology Equipment $ 1,970,000 Subtotal $ 52,304,911 Total Project Costs $ 52,304,911 Woodbridge School District Budget $ 52,539,700 Total Amount Under / (Over) Budget $ 234,789 Proposed Add Alternates $ 2,850,000 January 17, 2012

  7. Woodbridge School DistrictProject Schedule Space programming 09/22/11 – 11/16/11 Schematic Designs (30%) 11/11/11 – 01/17/12 Design Development (60%) 12/19/11 – 04/23/12 Construction Documents 03/22/12 – 08/23/12 Bid Pack A (Site Concrete & Steel) 8/20/12 Bid Pack B (building & Systems) 10/02/12 Funding available $10.5 m 10/2011 (FY-12) Funding available $21.0 m 10/2012 (FY-13) Funding available $21.0 m 10/2013 (FY-14)

  8. Questions and Answers Woodbridge SD AdministrationFearn - Clendaniel ArchitectsEDiS Company Thank you!