140 likes | 280 Views
Wireless Sea Measurement Unit Intermediate Report. A Plan for Aarne Halme Project Juha Vanhalakka Erkka Mutanen. Contents. Project Schedule Reprise Code Hardware Components Purchased Building Board i -iv Ready Chip Casing Mechanics After Installation. Project Schedule Reprise.
E N D
Wireless Sea Measurement UnitIntermediate Report A Plan for AarneHalme Project JuhaVanhalakka Erkka Mutanen
Contents • Project Schedule Reprise • Code • Hardware • Components Purchased • Building Board i-iv • Ready Chip • Casing • Mechanics • After Installation
Project Schedule Reprise • Project Plan 25.09. • Progress Report 30.10.+ electronics ready, code running • Demo A 20.11.+ casing ready, code ready • Demo B 27.11.+ mounting prototype done • Documentation done 10.12.
Code • Xbeecommunication is working • Measurement data logging incomplete • No tests done on the XBeechip • UI Code is late • Challenges: learn PHP from the start, learn JavaScript from the start • Also, possible changes in UI makes the programming take more time and more difficult
Hardware • Hardware is on time • We have a lab worker making us a seabed mount steel tube • Todo : power electronics dimensioning, (battery capacity against solar panel power) • Budget ?
Components Purchased • We have ordered all parts from Farnell and Digikey • We have a WIKA hydrostatic pressure sensor • We have a PT100 temperature sensor • We have an industrial grade casing from Ensto • List of components in Excel sheet
Ready Chip • 10 x 12 cm • Build start Oct 13th • Finished Oct 22nd • Includes recharging circuit and Xbeeradio I/O connectivity • Juha drew the board • Built 2 identical ones for parallel testing • Here it is: