YALE UNIVERSITY SOCIAL SCIENCES BUILDING. GPHB & ASSOCIATES Brad Otto, Client Liaison/Editor-in Chief Jake Wagle, Project Engineer Jimmy Murray, Project Engineer Erin R. Craft, Project Engineer Robbie Baldwin, Project Manager. OVERVIEW. Client and Organization Project Description
E N D
YALE UNIVERSITY SOCIAL SCIENCES BUILDING GPHB & ASSOCIATES Brad Otto, Client Liaison/Editor-in Chief Jake Wagle, Project EngineerJimmy Murray, Project EngineerErin R. Craft, Project Engineer Robbie Baldwin, Project Manager
OVERVIEW • Client and Organization • Project Description • Design Requirements • Project Approach • Design Solution • Conclusion
CLIENT AND ORGANIZATION • Hunt Construction Group - Indianapolis, Indiana - Robert W. Fuller, Construction Manager
PROJECT DESCRIPTION • Yale University in New Haven, Connecticut New Haven
PROJECT DESCRIPTION • Parallel bid process • Identify missed details • Discover alternative approaches • Obtain an understanding of construction methods and procedures
CONSTRUCTION MANAGEMENT • First year a Construction Management Project offered at Rose-Hulman • Learning along the way with our professors • Difficulties fitting design criteria into our project
DESIGN REQUIREMENTS • Constraints - No historical buildings or landmarks may be harmed These areas include: KNOT GARDEN HISTORIC MANSIONS SITE LUCE HALL
DESIGN REQUIREMENTS • Deliverables - Project Proposal - Site Utility Relocation Bid Package - Excavation Support/Shoring Design - Excavation Bid Package - Wall Formwork Selection - Wall Formwork Bid Package
PROJECT APPROACH • Design/Assessment of Options - Utility Relocation - Current utilities run directly through proposed site - Utilities relocated and functioning before excavation begins
PROJECT APPROACH • Sheeting and Shoring - Geotechnical report obtained from Hunt - Considered numerous shoring options Typical Soldier Pile/Lagging System
PROJECT APPROACH • Select Wall Formwork System - Foundation design provided by Hunt Construction - GPHB will select appropriate formwork system - Numerous options in consideration - Criteria of Selection: constructability, cost efficiency, functionality
PROJECT APPROACH • Utility Relocation Bid/Excavation & Formwork Bid - Guaranteed Maximum Price (GMP) bids - 2006 RS Means Manual - Labor Rate Adjustments - Unit Material Prices - Bonding, Permits, Fees
PROJECT APPROACH • Codes & Regulations - Occupational Safety and Health Administration (OSHA) - Connecticut State Building Code - International Building Code (IBC) - Environmental Protection Agency (EPA) - Leadership in Energy and Environmental Design (LEED) - LEED Silver Certification (possibly Gold)
UTILITY RELOCATION • Assessed multiple routes for utility relocation • Conducted research for two different excavation methods - Open Trenching - Directional Boring RECOMMENDATION:OPEN TRENCHING because directional boring poses many problems with such a high volume of utilities running beneath Prospect Street.
PROJECT PROGRESS NEWUTILITIES PROPOSED BUILDING EXISTINGUTILITIES NORTH
UTILITY RELOCATION Luce Hall Proposed Building I Existing Utilities Utility Relocation Route Proposed Building II 1 C-1 Prospect Street
UTILITY RELOCATION Existing Utilities Relocation Route 20’-0” 45’-0” 1 C-1
UTILITY RELOCATION • Bid Package 1 Quantity Take-Off- General Conditions/Requirements - Test Pits - Demolition and Access - Sediment and Erosion Control - Utility Excavation/Installation $746,000
CONSTRUCTION SEQUENCE • Place job trailer • Site Access • Demolition • Soldier Piles • Excavation • Structural Fill N
SOLDIER PILE DESIGN • Soldier Pile / Timber Lagging System • HP 12x53 sections (90) • 45’ long • Embedded 30’ into surface • 5” timber lagging 15’ 30’
REINFORCED CONCRETE WALL FORMWORK SYSTEM • Reinforced Cast-in-Place Concrete Wall • 15 inches thick & 12 feet 8 inches high • Various Temporary Forming Methods • Contractor Preference
REINFORCED CONCRETE WALL FORMWORK SYSTEM Side View X-Section
CONCLUSION/LESSONS LEARNED • Client satisfied with proposal • All requested designs complete • All requested bid packages complete • Information is difficult to obtain • Experienced bidders have large advantage (Means) • Schedule in advance (Everyone is busy) • Extremely valuable learning experience