STF421 ITS G5 Testing – An overview – CEN DSRC – ITS G5 Coexistence Workshop - Presented by FriedbertBerens, in Ispra, Italy STF421 – An Overview -
Overview • Scope • Members of STF421 • Deliverables • Status and planning STF421 overview
Scope of STF421 • The STF421 develops a set of specifications for the certification test of the CEN DSRC - ITS G5 coexistence mechanisms and the ITS – G5 Dynamic Congestion Control (DCC) mechanisms. STF421 overview
Resources of STF421 • 220 Person Days from 01.06.2011 to 30.6.2012 • STF 421 Member: • Paul Alexander (not on photo) • Friedbert Berens (STF Leader) • Madalina Tepelmann • Peter Schmitting • Dieter Smely • With support from the ETSI CTI (Sebastian Müller) • Photo with Christoph Wöste (TC ITS WG4 Chairman) STF421 overview
Schedule and planning of STF421 • Initial interims report to EC: • 30. September • Ready for ETSI 1. September • Stable draft of coexistence deliverables until Q4/2011 • Early draft of DCC deliverables until Q4/2011 • Final draft of deliverables for TC approval end Q1/2012 • Final report EC: • 30. June 2012 • Ready for ETSI approval in 1. June 2012 STF421 overview
Milestones of STF421 2011 • Milestone A: ITSWG4#15 (21 June), ETSI • Progress Report #1 and first draft of DTS/ITS-0040022 (PICS), DTS/ITS-0040023 (TSS&TPs), DTS/ITS-0040024 (ATS). • Milestone B: 1st September 2011 • Interim Report to be approved by EC/EFTA. • The Interim Report must be delivered by the STF Leader to the ETSI Secretariat before 1st September 2011. The deadline for delivery to EC/EFTA by the ETSI Secretariat is 30 September; EC/EFTA approval is expected mid-November • Milestone C: ITS#9, ETSI (October 2011) • Progress Report #2 and stable drafts of DTS/ITS-0040022, 023, 025 • First drafts of DTS/ITS-0040025 (PICS), DTS/ITS-0040026 (TSS&TPs), DTS/ITS-0040027 (ATS) STF421 overview
Status of STF421 • Preparatory meeting: 17. February 2011 in Sophia Antipolis • First Technical Meeting 31.5. and 1.6.2011 • Milestone A achieved 21.06.2011 • Activities is dependent on initial work in STF420 and ITSWG4 Coexistence AdHoc group STF421 overview
Deliverables • 1. Coexistence of cooperative ITS G5 with RTTT DSRC • DTS/ITS-0040022 (PICS) • DTS/ITS-0040023 (TSS&TPs) • DTS/ITS-0040024 (ATS) • 2. Channel congestion control algorithms operating in the 5.9GHz range • DTS/ITS-0040025 (PICS) • DTS/ITS-0040026 (TSS&TPs) • DTS/ITS-0040027 (ATS) STF421 overview
Document schedule 1. Phase • DTS/ITS-0040022 (PICS): DSRC/G5 Radio Test • TS 102 916 – 1 • First version early draft: 21.June • Stable draft: October 2011 • DTS/ITS-0040023 (TSS & TPs) : DSRC/G5 Radio Test • TS 102 916 – 2 • First version early draft: 21. June • Stable draft: October 2011 • DTS/ITS-0040024 (ATS) : DSRC/G5 Radio Test • TS 102 916 -3 • First version early draft: 21. June • Stable draft: October 2011 STF421 overview
Document schedule 1. Phase • DTS/ITS-0040025 (PICS): G5 Radio Test • TS 102 917 – 1 • First version early draft: October 2011 • Stable draft: Q1/2012 • DTS/ITS-0040026 (TSS & TPs): G5 Radio Test • TS 102 917 – 2 • First version early draft: October 2011 • Stable draft: Q1/2012 • DTS/ITS-0040027 (ATS): G5 Radio Test • TS 102 917 -3 • First version early draft: October 2011 • Stable draft: Q1/2012 STF421 overview
End Comments and Inputs Thank you for your attention For more Information friedbert.berens@me.com STF421: overview