10 likes | 195 Views
Stop #1 Ability to Use an Alternative Project Delivery. Stop #2 Guidelines for each of the Delivery Method Options. Stop #3 Selecting appropriate Project Delivery Method. Stop #4 Implementing the chosen Project Delivery Method.
E N D
Stop #1 Ability to Use an Alternative Project Delivery Stop #2 Guidelines for each of the Delivery Method Options Stop #3 Selecting appropriate Project Delivery Method Stop #4 Implementingthe chosen Project Delivery Method “Where are we andwhere do we want to be?”**The Four (4) Stops on the Road To Alternative Project Delivery ** Slide courtesy of Mike Kenig, Holder Construction “Introduction to Project Delivery Methods” HJR #28 - Studying "Best Value" Construction Contracting