An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BREAKOUT 9:ANSI/NIRMA Facilitator: Rick Harris and Mike Stout DUKE ENERGY June 11-14, 2006Richmond, VA

  2. Breakout #9ANSI/NIRMA Standard Review • Clarify definition of Authorization Basis Information (Section 2.3) • Changed “consistency” to “conformance” where it refers to CM Equilibrium Model. • Delete Configuration Controlled FCI definition, and delete single occurrence from 3.4.4 on page 9. • Deleted definition of “Margin” • Revised title of Appendix B to “ Examples of CM Performance indicators or health reports.” • Move CM Health Report from Appendix B to new section 3.5.5.

More Related