Methodology

ADAPT – Towards an integrated tool for deciding about adaptation measures – case study: floods Follow-up committee meeting 6 October 2009 Compilation of information on adaptation measures (Fiches - summary sheet) Eve Giron – CEESE (ULB). Methodology. Common framework for every “fiches”

parley
Download Presentation

Methodology

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ADAPT – Towards an integrated tool for deciding about adaptation measures – case study: floodsFollow-up committee meeting6 October 2009 Compilation of information on adaptation measures (Fiches - summary sheet) Eve Giron – CEESE (ULB)

  2. Methodology • Common framework for every “fiches” • Some examples • Details for the adaptation measure of the Ourthe case study

  3. The common framework 1) Definition 2) Categorisation 2.1 Intervention into the general flood risk assessment framework 2.2 Intervention in the DPSI-chain 3) Possible side effects 3.1 Components of the general flood risk assessment framework 3.2 Non-flood risk related socio-economic and ecological effects 4) Investment and operating costs 5) References

  4. Some examples Example: private protection measure • Combinaison of structural and non-structural measures • Vulnerability of the element-at-risk? • The measures is preventive, source oriented, effect oriented or curative? • Examples from the literature of rate of reduction because of the A.M.

  5. Some examples Example: protection walls/mobile dikes Costs expected: • equipment costs (md 450€/m-1,20m & 980€/m-1,80m)* • civil works costs (walls) • operating costs (Y/N) • storage costs (Y/N) • maintenance costs (++/+) *Source: Aquafence (mail enquiry)

  6. Specification about our adaptation measures • Data provided by Ulg for the volume of earth to be excavated, length and high of the wall… • Contact different construction companies with precise number • In order to determine and develop a precise CBA • Work on going…

  7. Thank you for your attention