An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    1. CE463 Lecture 22 Signal Timing Text: class notes HCM 2000, Chapters 10 and 16

    2. Volume Ratio and Green Allocation

    3. Critical Lane Group

    4. Average Green for a Phase Assumptions Signal cycle is C The actuated controller maintains xc in the critical lane group for the phase Average effective green for the phase is where (v/s)c is the volume ratio for the critical lane group and gmin is the minimum effective green

    5. Average Signal Timing for a Full-Actuated Controller

    6. Average Signal Timing Full-Actuated Controllers

    7. Example

    8. Example

    9. Example

    10. Example

    11. Example

    12. Example

    13. Example

    14. Average Signal Timing Semiactuated Controllers

    15. Example

    16. Example

    17. Minimum Green Constraint Calculate average signals using the methods already introduced If one or more green times are shorter than minimum, select the phase with the smallest gi/gmini and set gi=gmini Remove this phase from the sequence of phases and increase the total lost time in cycle by gmini Repeat step 1 and then steps 2 and 3 if needed

    18. Example

    19. Example

    20. Example

    21. Example

    22. Maximum Green Constraint Calculate average signals using the methods already introduced If one or more green times are longer than the maximum, select the phase with the largest gi/gmaxi and set gi=gmaxi Remove this phase from the sequence of phases and increase the total lost time in cycle by gmaxi Repeat step 1 and then steps 2 and 3 if needed

    23. END