1 / 13

NARUC 2012

NARUC 2012. The 21 st Century Grid. Energy Production. Energy Delivery. Energy Consumption. Ancillary Services. Commercial and Industrial. Traditional Power Generation. Load Centers. Solar Generation. Residential. Transmission & Distribution. Wind Generation. Target Segments.

patty
Download Presentation

NARUC 2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NARUC 2012

  2. The 21st Century Grid Energy Production Energy Delivery Energy Consumption Ancillary Services Commercial and Industrial Traditional Power Generation Load Centers Solar Generation Residential Transmission & Distribution Wind Generation

  3. Target Segments • Renewable Integration • Transmission & Distribution Providers • Ancillary Service Providers

  4. XtremePower TechnologyDynamic Power Resource™ System Integration Real-Time Control System PowerCells™ (MWh) Power Electronics (MW)

  5. Real Projects, Real Solutions * Project not yet announced

  6. Kahuku Wind PowerLargest North American Installation with Wind This DPR™ will operate on a 30 MW wind farm on the island of Oahu to meet PPA ramp control and smoothing requirements.

  7. Wind Farm Trip Event • Four WTG’s tripped offline causing an ~8 MW drop in power • DPR immediately discharges ~8 MW, ramps down park successfully

  8. Ford Michigan Assembly PlantReducing Costs, Increasing Reliability Ford selected the Xtreme Power DPR™ to operate with one of the largest solar power generation systems in Michigan. The DPR™ will help the plant save an estimated $160,000 in energy costs annually by shaving peak demands and leveling load.

  9. Solar Smoothing Clouds at Ford Solar

  10. Duke Notrees Largest Battery Energy Storage System in the World Duke Energy plans to match a $22 million grant from the U.S. Department of Energy to install a DPR™ capable of storing electricity produced by Duke’s 153 MW Notrees wind farm. After due diligence, Duke Energy chose Xtreme Power to design, install and operate this 36MW system. 9

  11. Duke Notrees Update Largest Battery Energy Storage System in the World • Under Construction • System Testing to Start Sept 2012 • TX PUC/ERCOT – Large Scale Pilot Program • System Revenue Begins 2013 – Reg Up, Reg Down 10

  12. Tres Amigas Providing America’s First Common Interconnection By implementing an estimated 100 MW/ 200 MWh DPR™, the Tres Amigas SuperStation will deliver a reliable supply of renewable power amongst America’s three power grids, the Eastern, Western (WECC), and Texas (ERCOT) Interconnections. 11

More Related