An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Gas Regional Initiative South South-East CAM Implementation Group Update on activity Bucharest, 20th November 2015 TITRE

  2. 2nd CAM IG meeting – update • Joint methodology for capacity calculation and maximisation - Art. 6 • E-Control presented kick-off proposal for discussion on harmonised methodology for calculation of technical capacities at IPs • Capacity quotas - Art. 8 • Long term contract mismatch – one year restriction for unbundled product • Capacity quotas for short-term and up to 5 years – more than 10/10% Qt • Competing capacities - Art. 8 (2) • IPs between more than 2 TSOs at one junction station (1:n) – auctions • Network’s technical congestion vs. competing capacities at IPs – auctions • IPs vs internal points (domestic points or storages) – auctions vs FCFS 19th GRI SSE SG meeting, Bucharest

  3. 2nd CAM IG meeting – update • Booking platforms – Art. 27 • Usage of Booking Platforms from 1st November 2015 • According to the latest CAM NC Roadmap and information passed on the GRI SSE CAM IG meeting: • PRISMAisused to auction capacity at the IPs between: • Czech Republic and Germany • Czech Republic and Slovakia • Austria and Slovakia • Croatia and Slovenia • RBP isused to auction capacity between: • Hungary and Romania • Hungary and Slovakia • GSAisused to auction capacity between: • Czech Republic and Poland • At the following IPs TSOs have not yet found an agreement on the choice for a single booking platform: • Austria and Hungary - tender procedure in preparation • Germany and Poland - bilateral discussions ongoing • Romania and Bulgaria - ? • Greece and Bulgaria - ? • Croatia and Hungary- ? 19th GRI SSE SG meeting, Bucharest

  4. 2nd CAM IG meeting – update • Update on compliance progress of booking platforms • All platforms declared full CAM NC compliance as of 1 November 2015 • Update on Booking Platforms’cooperation in the GRI SSE region • Cooperation between RBP and GSA as of November 2015 • FGSZ and GAZ-SYSTEM worked out the business concept and the technical cooperation model to connect RBP andGSA • The RBP-GSA communication was tested during the second half of September • Cooperation Agreement first draft prepared –in discussion between the Parties • The high-level documents of the RBP-GSA bilateral cooperation model have been shared with PRISMA and feedback has been provided 2nd CAM IG meeting of GRI SSE – Bucharest, 19th November 2015