1 / 8

Brochure

Brochure. R Jermyn 23 September 2008. Brochure. R Jermyn 23 September 2008. Services. Commodity Experience: 10 years Iron Ore (2 years); Mineral Sands (3 years); Diamonds (5 years). Combined production and capital projects experience throughout.

paul2
Download Presentation

Brochure

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Brochure R Jermyn 23 September 2008

  2. Brochure R Jermyn 23 September 2008

  3. Services • Commodity Experience: 10 years • Iron Ore (2 years); Mineral Sands (3 years); Diamonds (5 years). • Combined production and capital projects experience throughout. • LIMN Simulation Software: 10 years experience • LIMN Agent for Western Australia (software sales and support). • LIMN Training: 2 day beginner; advanced training; 1 on 1 coaching. • Plant Flowsheets: A0 plant overviews; detailed sectional flowsheets. • LIMN simulations: flowsheet option trade offs; constraint studies; de-bottlenecking; scenarios; calibrated against plant performance. • Capital Projects: • Financial analysis and trade off studies (NPV, IRR, payback etc). • Pre-feasibility through to Commissioning, Optimisation and Handover. • Natural leadership skills. • Problem solving and trouble shooting. • Green Belt Six Sigma (Define, Measure, Analyse, Improve, Control). • Mentoring of junior process engineers. Lead process engineer on projects. • Climate Change: calculation of carbon footprints and implementation of projects to reduce GHG emissions.

  4. Step 2: 1. Develop LIMN model 2. Calibrate with plant performance 3. Constraints simulations 4. De-bottlenecking scenarios Step 4: 1. Finance capital project 2. Detailed design 3. Install, commission, optimise 4. Update flowsheet Step 3: 1. Scope Of Work for options 2. Capital and Operating Costs for options 3. Revenue, NPV, IRR, payback for options 4. Select desired option The Proven Method Step 1: 1. Draw the flowsheet 2. Unit operation information 3. Check material flow 4. Check metallurgical accounting The Continuos Improvement Cycle

  5. Western Australia Generic Diamond Plant Flowsheet Compiled by: R Jermyn Date: 24 July 2008

  6. Western Australia Generic Mineral Sands Plant Flowsheet Compiled by: R Jermyn Date: 24 July 2008

  7. Western Australia Generic Water Usage Flowsheet Compiled by: R Jermyn Date: 24 July 2008

  8. Western Australia Generic Hematite Plant Flowsheet Compiled by: R Jermyn Date: 24 July 2008

More Related