An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Alvaro Simón, Esteban Freire, Sergio Díaz, Pablo Rey, Carlos Fernández, I. López, Javier Lopez / CESGA SA1-SWE Partner Coordination Meeting 2 CICA, Sevilla CESGA QR2

  2. Outline CESGA QR2, SA1-SWE Partner Coordination Meeting 2, Oct 22 2008 • Resource Commitments • Contribution to SA1 Tasks • What are the deviations? • What is the main success in the reporting period? • What is the main issue? • Hiring • Services • Milestones & Deliverables • Cross-activities Contribution

  3. Resource Commitments 1/2 CESGA QR2, SA1-SWE Partner Coordination Meeting 2, Oct 22 2008 • People • Alvaro Simón (18 PM) • Esteban Freire (18 PM) • Sergio Díaz (18 PM) • Javier López (12 PM) • Pablo Rey (12 PM) • Carlos Fernández (2 PM) • Ignacio López (1 PM) • Andres Gómez (1 PM) • Javier García Tobío (1 PM)

  4. Resource Commitments 2/2 CESGA QR2, SA1-SWE Partner Coordination Meeting 2, Oct 22 2008 • Computer Resources • Production (CESGA-EGEE) • Services: CE, CE2, MON, SE, UI, VOMS, LFC, WMS, WWW, WWW2, WWW3 • WN: 356 cores • PPS (CESGA-PPS) • Services: RGMA, MON, SE, CE • WN: 2 cores • Storage • 1 TB local storage • 14 TB Lustre (10% of global CESGA's Lustre SFS)

  5. Contribution to SA1 Tasks CESGA QR2, SA1-SWE Partner Coordination Meeting 2, Oct 22 2008 • TSA1.1.3: Monitoring and enforcement of SLAs: • A web page has been developed inside the SWE Portal to show the status of the SLD signature process and to keep track of specific site modifications to the default SLD conditions: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/sld.html • SLD signature sessions have been celebrated in several events: IberGrid 08, SWE SA1 PCM Madrid, and EGEE'08 • 14 of 21 sites have signed the SLD

  6. Contribution to SA1 Tasks CESGA QR2, SA1-SWE Partner Coordination Meeting 2, Oct 22 2008 • TSA1.1.5: Grid Accounting: • Creation of a new report that allows to compare the contributed elapsed time with the commitments of the technical annex (available in the development accounting portal) • https://www2.egee.cesga.es/gridsite/accounting/CESGA/dev/repegee.html • Improvement in the Accounting Portal to support site associations between OSG sites • New “go to top” link in each graph of the Accounting Portal • Demo EGEE'08: Intra-VO and individual user level accounting in EGEE

  7. Contribution to SA1 Tasks CESGA QR2, SA1-SWE Partner Coordination Meeting 2, Oct 22 2008 • TSA1.1.7: Operation of national or regional certification authorities and registration authorities: • Review of CESGA's RA policy to allow using digital certificates from FNMT or DNI-e to sign the certificate's requests, without the need for the user to come personally to CESGA's installations. • During the given period 32 certificate's requests have been processed: 27 for servers and 5 for users.

  8. Contribution to SA1 Tasks CESGA QR2, SA1-SWE Partner Coordination Meeting 2, Oct 22 2008 • TSA1.2.4 Production and Pre-Production • Production • New subcluster FORMIGA added to CESGA production site • Installation of I2G middleware in the WNs to allow MPI jobs • Updating SWE wiki pages with new information, like Quattor templates to be used by site admins • Installing new WMS gLite3.1 node for IMATH and CESGA VOs • Migration of all services from glite3.0 to gLite3.1 completed

  9. Contribution to SA1 Tasks CESGA QR2, SA1-SWE Partner Coordination Meeting 2, Oct 22 2008 • Pre-Production • Coordination of the pre-deployment activity. The following releases were coordinated during the present period: U33-37 of glite 3.1 • Installing and configuring glexec on PPS WN for LHCB pilots jobs. • Installation of a new gLite3.1 UI for PPS on SVGD • Pre-deployment of the following services (given per update): • U34: CE, SE, WN, MON and RGMA • U36: CE, SE, WN, MON and RGMA • U37: CE and WN • Update of the pre-deployment test introduction page (savannah task #7780). • Elaboration of a complete list of services to test and formal request to all PPS sites for collaboration testing orphaned services (services currently not tested by any partner) • Support for PPS sites, answering questions in the PPS mailing list • Presentation in EGEE'08: • The Deployment Test: Present and Future

  10. Contribution to SA1 Tasks CESGA QR2, SA1-SWE Partner Coordination Meeting 2, Oct 22 2008 • TSA1.2.6 Interoperations • Configuring and testing new I2G/EGEE interoperability procedure • Installing a configuring new CESGA interoperation infrastructure between EGEE/I2G and NGI-ES • Configuring regional Nagios monitoring tool to support NGI-ES sites • Collaboration with FORMIGA project to support its infrastructure into EGEE • Collaboration with IMATH project: support to add their sites in the EGEE infrastructure (UB and UNICAN) • Collaboration with Retelab and Cytedgrid projects

  11. Contribution to SA1 Tasks CESGA QR2, SA1-SWE Partner Coordination Meeting 2, Oct 22 2008 • TSA1.2.7 Monitoring Tools to support Grid operations: • Installation of a regional Nagios server for SWE federation: added PIC, LCG-USC, LIP and E-CA-IAA sites • Improved SWE SAM monitoring map and email alert functionality: possibility to monitor VOs different than OPS • Updating SWE SAM and GSTAT monitoring page to include new CEs in the ROC • OAT: Attendance to meetings, collaboration in MSA1.1: Operations Automation Strategy

  12. What are the deviations? CESGA QR2, SA1-SWE Partner Coordination Meeting 2, Oct 22 2008 • PPS Deployment test coordination: • Some services are not being tested because no partner is responsible for them. Also in some cases they are not tested because the responsible partner is on holidays. To solve this issue we are building a complete list of services and looking for a responsible for each service as well as a “backup” site in case the primary responsible can not do the testing.

  13. What is the main success in the reporting period? CESGA QR2, SA1-SWE Partner Coordination Meeting 2, Oct 22 2008 • The main success was the work done to accomplish the interoperability between EGEE, I2G, IMATH, FORMIGA and NGI-ES.

  14. What is the main issue in the reporting period? CESGA QR2, SA1-SWE Partner Coordination Meeting 2, Oct 22 2008 • The main issue was gLite3.1 migration • Some bugs in critical services were found. In some cases, we had to wait for a new patch to solve these critical problems. • PPS Deployment Test Activity Issue: • As coordinators of the pre-deployment test activity, we had an issue on August with the package lcg-sam-client-sensors that had erroneous dependencies with GFAL-client package. • The problem was not detected because the package was erroneously included under glite-torque package instead of glite-WN. Glite-WN was tested but since we are using glite-SGE_utils instead of glite-torque the lcg-sam-client-sensors were not tested and the bug passed to production. No other partner with glite-torque tested this release.

  15. Hiring CESGA QR2, SA1-SWE Partner Coordination Meeting 2, Oct 22 2008 • Hiring: how many SA1 PMs are still not assigned (e.g. because of hiring problems)? • None

  16. Services 1/2 CESGA QR2, SA1-SWE Partner Coordination Meeting 2, Oct 22 2008 • Basic Monitoring Service • Regional Nagios • Gridice • Monitoring alerts • SWE federation's monitoring web page • Accounting • EGEE accounting portal (GOC EGEE View) • Accounting Enforcement Portal • SWE federation's accounting web site • Apel installation support in the SWE federation • Weekly Apel status report • Daily monitoring of accounting data published by SWE federation sites • Standalone CPU normalization test • PPS Central Accounting Repository (LcgRecords Flexible Archiver) • EGEE Regional Accounting Portal (EGEE-RAP) • Accounting Metrics

  17. Services 2/2 CESGA QR2, SA1-SWE Partner Coordination Meeting 2, Oct 22 2008 • Pre-Production Site • Pre-production cluster (CESGA-PPS) • Central PPS R-GMA registry server • PPS wiki • PPS GOCdb View • GridIce • Helpdesk • Support by email/phone to other members of the SWE federation about the installation of the LCG accounting and monitoring tools. • Support by email/phone to the users of the TDC and PPS. • GGUS Accounting Apel Support Unit. • GGUS Accounting Policies Support Unit. • Additional services • VO IMATH • WMS, LB and VOMS • VO CESGA • WMS, LB and VOMS • SWE Resources Page • SWE wiki • pkIrisGrid Registration Authority (RA)

  18. Milestones & Deliverables CESGA QR2, SA1-SWE Partner Coordination Meeting 2, Oct 22 2008 • Global milestones & deliverables • MSA1.1: Operations Automation Strategy: contributions related to accounting and ROC • CESGA's internal milestones & deliverables • M1: I2G Integrated • I2G infrastructure was fully integrated into EGEE sharing all CESGA’s WNs • M2: SGE MPI support lcg-CE • New SGE JobManager for MPI was written and will be tested next months • DSA1: RA CESGA Policy v1 • The document with the policy to RA CESGA was done and published on link, http://www.irisgrid.es/pki/policy/ra/pkirisgrid-cesga-policy-1.3.0-20080424.pdf • DSA4: SGE Support Roadmap V1 • A first draft version was done • DSA5: Assessment of additional services to install locally v1 • New gLite3.1 services like WMS and LFC catalog were installed and tested for local VOs • DSA6: Assessment of additional services to install for SWE ROC v1 • A new regional Nagios for SWE federation was installed • DSA9: Analysis of r­Nagios • r-Nagios was tested successfully

  19. Cross-activities Contribution CESGA QR2, SA1-SWE Partner Coordination Meeting 2, Oct 22 2008 • A list of the participation of the partner in any of the main groups, task force, bodies, representing the partner, the ROC or the SA1 activity. • PPS: • CESGA is responsible for the Deployment Tests Coordination • OAT: • Member of the core team

  20. Thank you CESGA QR2, SA1-SWE Partner Coordination Meeting 2, Oct 22 2008

More Related