An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Structured / Unstructured Market Trials Weekly Update – Friday Meeting August 23, 2013

  2. Call Reminders • Please help to minimize disruptions: • Mute your phones • Do not dial-in from a recorded line • Do not put the call on hold, even if you are on mute

  3. Agenda • TCR / ECT Update (5 min) 9:00-9:05A • Analysis Aug 12 – Aug 18 (35 min) 9:05-9:40A • Settlements (10 min) 9:40-9:50A • Announcements & Outstanding Questions (5 min) 9:50-9:55A • Commitment Parameters (10 min) 9:55-10:05A • Look-Ahead Aug 26 – Sept 2 (10 min) 10:05-10:15A • Updates (10 min) 10:15-10:25A • Release Scorecard • Migration Report • Known Issues Log • Questions (5 min) 10:25-10:30A

  4. TCR Summary • Allocation Process • Auction Process • Revenue • Next Steps John Snyder

  5. TCR: Allocation Percentage • Allocated MW lower than Annual • Due to Baseloading TCRs & Model Changes John Snyder

  6. TCR: Auction Participation John Snyder

  7. TCR: Revenue by AO: September On-peak Net Revenue $171,140 Charges Credits John Snyder

  8. TCR Participation / Model Changes Drive Revenue John Snyder

  9. TCR Participation Self Converts (MW) • 883 MW On-Peak • 853 MW Off-Peak Buy Bid & Sell Offers (#) • 222 On-Peak • 153 Off-Peak ARR MW with no set Price (%) • 43% in On-Peak • 61% in Off-Peak John Snyder

  10. TCR Next Steps August 27, September 4 • ARR Level 3 Training: • Phase 2 Monthly Processes • Allocation Nominations: • Auction Bids/Offers: September 9 September 16-17, 23-24 John Snyder

  11. TCR: Go-Live Preparation • Submit Your Historical Peak Load • Who:  Only those MPs with NITS Service • What:  Historical Peak Loads (Load + Transmission Losses) for 2010, 2011 & 2012 for the historical coincident peak load for your system. • Why:  Validation purposes to compare against what we pull from settled EIS transmission settlements. • When: by September 18, 2013 John Snyder

  12. Extended Connectivity Testing • ECT Test Execution (occurs between 8/5 and 8/30): • MPs have been assigned a week during test execution time frame to perform their testing. • Weekly Execution Assignments • Tests are performed independently during the assigned week. No appointment is necessary. • Issues with test execution handled via RMS . • Metrics updated as of Wednesday 8/14 at 12:00pm CPT • iDashboard – Market Trials Connectivity External Dashboard Michael Hodges

  13. Extended Connectivity Testing • Test Execution: Michael Hodges

  14. Extended Connectivity Testing • Test Execution: Michael Hodges

  15. Extended Connectivity Testing • The following MPs have not submitted an Connectivity Test Checklist (due 8/2): Michael Hodges

  16. Extended Connectivity Testing • The following MPs have missed their scheduled Connectivity Test Execution (scheduled 8/5 – 8/6): Michael Hodges

  17. Analysis: August 12 – August 18 • Structured Market Trials Statistics posted the day after each OD spp.org > Integrated Marketplace > Market Trials > Structured/Unstructured Test > Integrated Marketplace Market Trials Project Documentation Folder > Structured Market Trials Presentations, Statistics, MP Meetings • Analysisof Aug 13, 14 and 15 Operating Days posted Tues to spp.org spp.org > Integrated Marketplace > Market Trials > Structured/Unstructured Test > Integrated Marketplace Market Trials Project Documentation Folder > Structured Market Trials Presentations, Statistics, MP Meetings Alan Adams

  18. Market Settlements Outstanding Questions • Question: Is there a way to automatically download (via API) the PDF Invoices from the Portal? • Answer: • The API only returns the XML Invoice. • Most systems that are using the API's are getting the results to load into a database and XML is format being used. • A PDF Invoice will be available and can be downloaded manually through the Portal UI (coming soon). Tony Alexander

  19. Market Settlements Outstanding Questions • Question: Can SPP provide a list of Charge Types by MP type (Financial Only, Load Only, Resource Only, etc.)? • Answer: • Settlements Reference Toolsincludes 3 charge type documents. • Charge Type be Transaction Chartshows all charge types triggered by specific market activity (Loads, Resources, Virtuals, etc.) • Developing a report specific to this question. Tony Alexander

  20. Market Settlements Progress • Initial Settlements for ODs 8-5 thru 8-15 are posted. • Initial Settlements for ODs 8-16 thru 8-17 are complete and being validated. • Final Settlements for ODs 8-5 thru 8-8 are posted. • Final Settlements for ODs 8-9 thru 8-10 are complete and being validated. • Weekly Invoice for 8-22 is posted. Tony Alexander

  21. Settlement Issues • KIL#TBD: TCR to Settlements Transactions - Sell Indicator Logic Change • The interface between TCR/ARRs and Settlements sets the sign convention. • TCR Self-Convert quantities were being incorrectly reversed (error). • TCR Sell quantities were being correctly reversed (correct). • The fix has been implemented. • Initial Settlements for ODs Aug 14 forward will reflect correct data. • Final Settlements for ODs Aug 11 forward will reflect correct data. Tony Alexander

  22. Settlements Scorecard Delay • Settlements Scorecard is still being developed and tested. • Targeting delivery next week. Tony Alexander

  23. Settlements BSS and Meter Data Submission • CWG follow up. • Issue: Market Participants would prefer to use their own BSS and Meter Data submissions in Settlements. • The intent of the following slides is to raise awareness of the SMT settlement impacts. Tony Alexander

  24. Settlements BSS Data Submission • The CWG has already decided that BSS metrics are not required for Market Trials. • MPs are not required to submit BSS data or participate in BSS testing. • Should BSS testing be removed from SMT scenarios? • SPP will continue to settle and report BSS activity based on MP participation. Tony Alexander

  25. Settlements Meter Data Submission • Meter data is an input to over 50% of the charge types and over 80% of the scenarios. • Triggering charge types and scenarios requires the meter data to be; • less than set point, • more than set point, • or zero, • and must align to the same intervals as dispatch instructions. • Different variations are required to trigger desired charge types and scenarios. Tony Alexander

  26. Settlements Meter Data Submission • Additional considerations: • If MAs are not submitting meter data according to set point there will be high amounts of deviation charges and credits. •  If MAs are not balancing Settlement Area generation, interchange, and load in their meter data submittals there will be high amounts of calibration. • Settlements needs to continue to run on OD+2 until the settlement systems are able to operate according to OD+4 timeline. • Meter Data submitted after OD+1 will be included on Final Settlements. Tony Alexander

  27. Settlements Meter Data Submission • Below are some options to consider if MAs will be submitting their own meter data: • 1) Remove charge types and settlement scenarios from Market Trials metrics. • 2) Treat charge types and settlement scenarios as non-metrics, MPs will not hit them all (metrics are for reporting purposes only). • 3) Settlements can trigger as many charge types and scenarios as possible by Aug 31 and then begin using MA Meter Data only. • Open to other suggested options. Tony Alexander

  28. Announcements & Outstanding Questions • Update on Markets v 1.5 • Installation postponed • Scenario Schedule adjusted accordingly • Scenario 33A & 33B Ramp Reservation: SPP Analysis ongoing • SPP Pass/Fail status to be determined • No Scenario 33 Email to be sent today • Known Issue Log Meetings scheduled to review Defects prior to their migration to Production • Monday, August 26 9:00-10:00A CPT register here • Monday, September 9 9:00-10:00A CPT register here • Monday, October 28 9:00-10:00A CPT register here Carrie Simpson / Ginny Watson

  29. Day Ahead Coverage of September SMT • Beginning in September, SMT will provide 5 supported days per week (Mon – Fri) • The Day Ahead Market’s Supported solutions will be executed Monday through Friday for Operating Days that fall on Tuesday through Saturday. • Aligns the Day Ahead executions with other SMT support functions – such as Hot Line, IT Support, etc. • Aligns the Day Ahead executions with MP’s work week for bid/offer submittal and DA Results review. Jeff Fruit

  30. Resource Offer Commitment Parameters Commitment Parameters Presentation to be posted to spp.org: spp.org > Integrated Marketplace > Market Trials > Structured/Unstructured Test > Integrated Marketplace Market Trials Project Documentation Folder > Structured Market Trials Reference Documents Ginny Watson

  31. Look-Ahead: August 26 – Sept 1 • Aug 26 – Sept 1 Daily Calendar • spp.org > Integrated Marketplace > Market Trials > Structured/Unstructured Test > Integrated Marketplace Market Trials Project Documentation Folder • Includes some Settlements Dates. All details on Settlements Calendarmarketplace.spp.org > Public > Settlements > Calendars • Scheduled Scenarios • Unstructured Testing Days – Tues 8/27, Wed 8/28 & Thurs 8/29 • 20.0 CRD Retest Appointment via Conf. Call scheduled with individual MPs • MPs wishing to participate in the retest: submit an RMS Ticket by 5P Mon 8/26 • Official Operating Days – Tues Aug 27, Weds Aug 28, Thurs Aug 29 • Friday Maintenance • Saturday reserved for MP Testing Ginny Watson

  32. 22.0 Manual and ID RUC Commitment *Scenario 22 to be executed the week of Sept 9 Scenario Description • RUC process will change the commitment period of a resource already committed in the COP either by starting the resource earlier or running the resource for additional hours. For this Scenario to work, the Resources have to be online and generating. If they are not online and generating, they are not eligible for the MWP. The following conditions will be simulated: • RTBM extension of DA Market Commitment by SPP RUC Operator • RTBM extension of DA Market Commitment by MP • This Scenario does not apply to NDVERS and VERS with SPP provided forecast • Submitan RMS Ticket labeled “Scenario 22” indicating what resources will be used in this Scenario by Sept 6 • Should include the hours that the selected Resource plans to be running in the EIS Market. If possible, select a Resource that will be online all 24 hours. Alan Adams

  33. Release Scorecard Release Scorecardposted to spp.org: spp.org > Integrated Marketplace > Market Trials > Structured/Unstructured Test > Integrated Marketplace Market Trials Project Documentation Folder Ginny Watson

  34. Migration and Maintenance Report Migration and Maintenance Report posted to spp.org spp.org > Integrated Marketplace > Market Trials > Structured/Unstructured Test > Integrated Marketplace Market Trials Project Documentation Folder MT Tagged Transactions documentationposted to spp.org spp.org > Integrated Marketplace > Market Trials > Structured/Unstructured Test > Integrated Marketplace Market Trials Project Documentation Folder > Structured Market Trials Reference Documents Wendy Reynolds

  35. Known Issues Log Market Trials Known Issues Log posted to spp.org spp.org > Integrated Marketplace > Market Trials > Structured/Unstructured Test > Integrated Marketplace Market Trials Project Documentation Folder Carrie Simpson

  36. Scheduled Scenarios • Aug 26 – Sept 1 • Unstructured Test Days • 20.0 - CRD Retest Appointments • Sept 2 – Sept 8 • 5.1 – Day Ahead Capacity Shortage • 5.2 – RUC Capacity Shortage Ginny Watson

  37. Market Trials Useful Resources SMT Hotline: 501-482-2222 for critical & high issues Mon-Fri 8A – 5P Please submit all other inquiries via the Request Management System (RMS) Settlements Calendar marketplace.spp.org > Public > Settlements > Calendars Integrated Marketplace Market Trials Project Documentation Folder spp.org > Integrated Marketplace > Market Trials > Structured/Unstructured Test > Integrated Marketplace Market Trials Project Documentation Folder • Documents found here include: Daily Calendar, Release Scorecard, Migration Report, Known Issues Log, Market Participant Guide • SMT Presentations, Statistics, MP Meetings Folder • SMT Reference Documents Folder • SMT Scenarios Folder Change Tracker spp.org > Integrated Marketplace > Marketplace Documents