An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Webinar – TEPPC 2022 Common CaseOTC & Plant Retirement Assumptions DWG October 18, 2011

  2. Objective of Today's Meeting • Finalize OTC Assumptions for the TEPPC 2022 Common Case • Isolate those pieces all participants can agree upon • Determine if any double counting? • Identify how many MW are at issue? • Quantify difference? • Finalize Plant Retirement Assumptions for the TEPPC 2022 Common Case • LRS, LBNL vs. DWG (SPG’s submittal) • Set criteria, SPG’s assumptions should prevail when others do not agree

  3. Assumptions • Retirement • SWRCB policy dates for compliance • LADWP Compliance Plans, voted and approved by the SWRCB • Repower • Known repowering • Needed for Local Capacity Requirement (LCR) • Replacement • CAISO LCR analysis done in 2011 - 2,000 MW need in the LA Basin Local Reliability Area (with El Segundo Repower need 1,440 MW) • DWG reached consensus on replacing the 1,440 MW with 50-50, CCCTs - GTs • San Diego does not have LCR need if Pio Pico 300 MW and Quail Brush 100 MW assumed added in the dataset. • Marsh Landing 760 MW and Oakley 620 MW additions fill Bay Area LCR Need

  4. Summary of OTC Retirement Assumptions (MW)