“Reconstitution” in COST. Reconstitution in COST. CBS 3.5 “Equipment Maintenance” “Organizational Level Maintenance” Equipment must be fully mission capable Equipment fault identification occurs during prescribed inspection intervals Equipment servicing performed regularly
E N D
Reconstitution in COST • CBS 3.5 “Equipment Maintenance” • “Organizational Level Maintenance” • Equipment must be fully mission capable • Equipment fault identification occurs during prescribed inspection intervals • Equipment servicing performed regularly • Urgent, limited & safety related work orders applied • BII & COEI are available or on valid funding requests (basic issue items & component of end items)
Calculations • Four reconstitution equations • Ships • Aircraft • Ground equipment • Ground units • Equations updated September 2002 • COST users can modify values • Factor overrides • Calculated-cost overrides
Equations Ships: [# Ships] x [# Incremental Steaming Days] x [$/Steaming Day] Aircraft: [# Months Sustainment] x [# A/C] x [Incremental Optempo] x[# Peacetime FH/Month] x [$/FH] x [Climate & Terrain Weights] Ground Equipment: [# Months Sustainment] x [# Equipment] x [Incremental Optempo] x[# Peacetime Miles/Month] x [$/Mile] x [Climate & Terrain Weights] Ground Units: [# Months Sustainment]x [# Personnel] x [% Asset Value Reconstitution Factor] x [$ Asset Value/Person] x [Incremental Optempo] x [Climate & Terrain Weights]
Equation Inputs & Sources • Service-provided data • Asset value • Peacetime optempo • Reconstitution factors (e.g. $/mile) • User-entered data • Climate & terrain at destination • Incremental optempo • Duration • Quantity of people or equipment
Aircraft $/FH # Months sustainment # A/C Incremental optempo Peacetime FH/month Climate Weight* Terrain Weight* Multiplier set by model Condition set by user
Ground Equipment $/Mile # Months Sustainment # Equipment Incremental Optempo # Peacetime Miles/Month Climate Weight* Terrain Weight* Multiplier set by model Condition set by user
Ground Units $ Asset Value/Person # Months Sustainment # Personnel Incremental Optempo % Asset Value Reconstitution Factor Climate Weight* Terrain Weight* Multiplier set by model Condition set by user
Ships $/Steaming Day # Ships # Incremental Steaming Days
Navy Ships CER Derivation • Relationship of reconstitution to optempo costs • Developed from service-provided cost factors • Used for ships without a service-provided cost
Navy Aircraft CER Derivation • Relationship of reconstitution to optempo costs • Developed from service-provided cost factors • Used for aircraft without a service-provided cost
Reconstitution CER Application • Reconstitution CER applied to operating costs • Generates reconstitution cost factor used in COST