Monsoon has arrived!<br>How much preparation you have made for your Pre Engineered Building?<br>Here is a maintenance checklist for your PEB that will let you know what part of your PEB required maintenance in Monsoon!
E N D
PRE MONSOON PRE MONSOON CHECKLIST CHECKLIST PRE-ENGINEERED BUILDINGS Pre-Engineered Building Elements and Need for Pre-Monsoon Checks Pre-Engineered Building Elements and Need for Pre-Monsoon Checks www.epack.in www.epack.in
THINK PREFAB THINK PREFAB THINK EPACK THINK EPACK Pre-Engineered Building Elements and Need for Pre-Monsoon Checks Roong Assemblies ELEMENTS METAL BUILDINGS Other Various Critical Elements / Parts Factors : Pollution WHY TIMELY MAINTENANCE Environmental factors Pollution To Achieve Productivity Damages : Rust Damages : Elemental Factors : Environmental www.epack.in www.epack.in
Pre-Monsoon Maintenance - Critical Areas Pre-Monsoon Checks to Avoid Pre-Monsoon Checks to Avoid Potential Leakage Potential Leakage Critical Areas Roof Sheets / Flashings & Other Roof Components Miscellaneous Areas Eaves & Valley Gutters Down Spout Pipes Critical Areas & Checks Critical Areas & Checks Roof Sheets / Flashings Miscellaneous Areas Eaves & Valley Down Spout Pipes Ÿ Includes Other Roof Components Ÿ Check for Damages due to wind, storm, live movements. Ÿ Check for gaps, improper overlaps. Ÿ Check for blockages in pipes. Ÿ Ensure clear free ow of water from roof. Ÿ Opening of down spout must be atleast 1 feet above ground. Ÿ Check areas which are modied/ repaired after execution. Ÿ Check for weak points. Ÿ Check for leakages. Ÿ Check for debris, garbage, dry leaves. Ÿ Items which may cause choke. Ÿ Defects which may cost direct leakage. Regular Cleaning Required in Regular Cleaning Required in Gutters Gutters Water Settling and entering below Water Settling and entering below louver Flashing louver Flashing Flashing to be change Flashing to be change
Maintenance of Pre-Engineered Building Maintenance in PEB Buildings Maintenance in PEB Buildings Maintenance Records- Importance Maintenance of Accessories Safety Measure during Maintenance work Standard Maintenance Procedure Periodic Schedule Standard Maintenance Procedure Standard Maintenance Procedure Maintenance in PEB Buildings Maintenance in PEB Buildings Standard Maintenance Procedure Ÿ Cleaning of encrusted Panels using mild detergent solutions. Ÿ Cleaning of Oil, Grease, Wax etc, using mineral spirits. Ÿ Use of caustic or abrasive cleaners to be avoided. Ÿ Remove Sand & Dust Ÿ Remove waste & small items like screws, rivets, drill bits. Ÿ Removal using Nylon Brush. Ÿ Remove large items using hands like cut off metal sheets Ÿ Adopt Pro-Active approach.
Maintenance of Accessories in PEB Maintenance in PEB Buildings Maintenance in PEB Buildings Maintenance of Accessories CRANES ROLL UP DOORS POWER VENTS DOORS SLIDING DOORS SKYLIGHT Ÿ Bottom guide rail to be cleaned. Ÿ For dirt, sand & stones. Ÿ Regular Cleaning of dirt will improve lighting Ÿ Dirt, Grit removal Ÿ Hinges & Locksets Lubrication. Ÿ Avoid Striking of door on wall. Ÿ Periodic Cleaning Ÿ Lubrication of drive gears & chains Ÿ Cleaning of dirts from fan blades Ÿ Checks for bracings. Ÿ Checking bolts tighten or not. www.epack.in www.epack.in
Periodic Schedule and Records Maintenance in PEB Buildings Maintenance in PEB Buildings Maintenance Records Importance Periodic Schedule For Buildings Regular Maintenance Log book to be kept Ÿ Medium Polluted Ÿ High Humid Area Within 5 kms of Ÿ High Polluted Ÿ High Humid Area Ÿ Low Polluted Ÿ Low Humid Area Entries by maintenance supervisor / staff with signature Effective working standard safety measure Records maintenance dates, actions, remarks Every 3 months Every 4 months Every 6 months www.epack.in www.epack.in
Safety Measures while doing Maintenance of Pre Engineered Buildings. Maintenance in PEB Buildings Maintenance in PEB Buildings Safety Measures Ÿ No Stepping on Skylights. Ÿ Walking carefully & as far as Possible on Walkways. Ÿ Walking can be also on Valley Purlin, or screw line. Ÿ Competent & Supervised / Experienced workers. Ÿ Access Ladder Should be 1 Meter Above Step off Point & Must Have Firm Base. Ÿ Use of PPE (Personal Protective Equipments) Ÿ Demobilization of Cranes before its maintenance. PPE’s Required PPE’s Required www.epack.in www.epack.in
THINK PREFAB THINK EPACK EPACK POLYMERS PVT. LTD. 61-B&C, Udyog Vihar, Surajpur Kasna Road Greater Noida, Uttar Pradesh, India: 201306 Unit-1 : Phone : Unit2 : B-13, Ecotech-1st Extension Greater Noida, Uttar Pradesh, India: 201306 +91-8130444466 +91-8130444477 Email : enquiry@epack.in , sales@epack.in www.epack.in