Mike Leitch, LANL Run Coordinator Run7 Report PHENIX 2007 Collaboration Meeting

cosmic ray muons. reaction plane. Mike Leitch, LANL Run Coordinator Run7 Report PHENIX 2007 Collaboration Meeting Boulder, 11-13 July 2007. cosmics. Run7 Chronology. Originally hoped to start with Nov 1 st cool-down and PHENIX planned for:

peers
Download Presentation

Mike Leitch, LANL Run Coordinator Run7 Report PHENIX 2007 Collaboration Meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. cosmic ray muons reaction plane Mike Leitch, LANL Run Coordinator Run7 Report PHENIX 2007 Collaboration Meeting Boulder, 11-13 July 2007 PHENIX - MJL

  2. cosmics Run7 Chronology • Originally hoped to start with Nov 1st cool-down and PHENIX planned for: • AuAu – 15 wks (1.1 nb-1), pp – 10 wks (32 pb-1) • Delayed by continuing resolution & meager FY06 level to match • But PHENIX started anyhow: • Cosmic rays starting Jan 9th • “Run7 is on” Feb 1st • Start of cool-down Feb 8th • Cryo problems Feb 24th • Rings cold & with beam Mar 13th • Start of Physics Mar 27th • End of Run7 Jun 26th • 13 wks of physics (Mar 27th – Jun 26th) PHENIX - MJL

  3. Important Run7 Dates and Run Numbers • 3/27 "Start of physics" 1st run 227016 • 4/2 23:59 Change to BBCLL1(>1 tubes) 1st run after change 228040 for main MB trigger • 4/4 14:15 scaler update change 1st run after change 228040 from 5 to 30 seconds • 4/25 HBD West out 1st run after this 231210 (during maintenance day) • 5/11 20:18 last level-2 config change 1st run after 234416 (E/p > 0.35 instead of > 0.5) • 5/21 9:30 am "++" magnetic field 1st run after this started 235889 - 5/23 10:00 am • 5/23 10:00 go to "-+" magnet config 1st run after change 236133 (during maintenance day) • 6/4 14:22 fixed PC-E channels finally about 237717 • 6/6 5pm low-energy run last run before this 237831 - 6/7 4pm (after maintenance day) 1st run after it 238022 • 6/12 major DC LV repair after 238681 West-south sectors 6,7,8 • 6/12 12:05 am (west) converter run includes runs between 238682 - 6/14 8:00 am and 238854 (inclusive) run 238943 is after it is out • 6/26 11:00 end of run last run 240121 • 6/29 2:00 end of run party.... PHENIX - MJL

  4. PHENIX Physics Goals for Run7 • Increase statistical & systematic precision of rare signals in AuAu, e.g. J/, jet correlations, etc • Increase reach in pT, especially with PID from new TOF-West detector (pT > 8 GeV/c) • Identified particle spectra • Identified leading particles in jets • Factor of two or more improvement in Reaction Plane resolution - valuable to many signals • v2 for J/,  - new • electrons, hadrons – extended • Low-mass lepton pairs with the HBD simulation Submitted to PRL PHENIX - MJL

  5. Four New Detector Subsystems for Run7 MPC-N RXNP TOF-W HBD PHENIX - MJL

  6. MPC RXNP < cos 2(Fsouth - Fnorth ) > MPC BBC < cos 2(FA+B - Ftrue ) > RXN MPC BBC < cos 2(FA – FB ) > PHENIX Reaction Plane Measurements Now from MPC, RXNP & BBC Reaction Plane Detector Centrality PHENIX - MJL

  7. TOF-West Particle Identification PHENIX - MJL

  8. 5.12 Billion Min-bias events 813 b-1 (~3.4 x Run4) PHENIX - MJL

  9. The PHENIX Luminosity Story *Vertex eff slightly worse after “+-”  “-+” magnetic field change (cause of lower vtx eff for last week than whole run) PHENIX - MJL

  10. Effects of Stochastic Cooling at PHENIX beginning of store Improvement in integrated luminosity for PHENIX with Stochastic Cooling (SC) 16% end of store from blue beam from yellow beam PHENIX - MJL

  11. Fraction of Time at Collision PHENIX - MJL

  12. Luminosity/Day vs Day PHENIX - MJL

  13. PHENIX Triggering & fast analysis for Run7 • Level-1 Triggering just Minimum-Bias (+UPC) • 5 kHz event rate through DAQ • only small fraction of integrated luminosity missed due to rates above the DAQ limit in the 1st ½ hour or so of stores • Level-2 filtering in ATP’s producing selected, parallel sample of enriched events for fast processing • J/  ; J/  ee; high-pT level-2 triggers • 10% of raw data size • sent to CCF in France via GRIDFTP • analyzed in France for fast results • 10% of min-bias events sent to Vanderbilt for fast analysis • check analysis/calibrations, prepare for full analysis pass • provide events needed for mixing in level-2 analysis • Counting house machines for fast HBD analysis PHENIX - MJL

  14. PHENIX Data Acquisition (DAQ) • Present DAQ performance: • up to 5 khz event rate & 700 Mb/sec throughput • DAQ Advances: • level-2 code speedup • additional buffer box • fix SEB memory leaks • more compact HBD data format • etc PHENIX - MJL

  15. (plot from Tom Throwe) PHENIX - MJL

  16. cosmics PHENIX Shakedown/Cosmic Ray Running (Jan & Feb) • Need Cosmic Ray background measurement for W physics • Cosmic/W estimated to be 1/1 for p>=10 GeV, but estimate is unreliable – need measurement! • Also Cosmic ray in EMCal looks much like high-pT photon PHENIX - MJL

  17. J/’s in AuAu Collisions at PHENIX PRL96, 012304 (2006) PRL98, 232301 (2007) Statistical & systematic precision of new Run7 AuAu data will improve this picture – But will also benefit enormously from new dAu data that can constrain the cold nuclear matter baseline accurately PHENIX - MJL

  18. From Tony Frawley, heavy PWG, Jan 4th Expected Results for J/ flow from Run7 PHENIX - MJL

  19. unlike-sign pairs like-sign pairs (randoms) thanks to Catherine Silvestre J/   for ~8% of present Run7 integrated luminosity (~16,000 J/   for present luminosity sum) PHENIX - MJL

  20. J/  e+e- about 15% of level-2 data thanks to Ermias Atomssa & Raphael Granier de Cassagnac PHENIX - MJL

  21. 0’s & ‘s thanks to Justin Franz from about 16% of present data 0  extended range in pT PHENIX - MJL

  22. signal electron Cherenkov blobs e- partner positron needed for rejection e+ qpair opening angle Hadron Blind Detector (HBD) • A “hadron-blind” detector to detect and track electrons near the vertex.” • Dalitz rejection via opening angle • Identify electrons in field free region • Veto signal electrons with partner • HBD: a novel detector concept: • windowless CF4 Cherenkov detector • 50 cm radiator length • CsI reflective photocathode • Triple GEM with pad readout • The HBD will improve our S/Bby a factor of ~100 Submitted to PRL PHENIX - MJL

  23. West side of HBD taken out Apr 25th for repairs • HV trips with large stored energy damaged detector • Now being refurbished with new GEM’s & fixed HV • ½ of the East side of HBD still in Hadron Blind Detector (HBD) hadrons electrons PHENIX - MJL

  24. PHENIX Issues & Failures • HV problems • Slow or dead servers • SA1 screen slow, or dead • Non-standard subsystem HV control – HBD, ToF-W, ToF-E • Unclear subsystem standing orders • LV problems • Connections or burned out LV modules • DAQ front end • HBD event size and zero suppression • DC large packets • MPC fiber split, muTr & EmCal new formats done • SEB memory leaks • Buffer Boxes • Confusion about Box7 (LVL-2) & its transfers • Weird transfer impact on DAQ speed when trigger rate high • Several disk failures • Event builder & ATP’s • Did not reach near 5khz event rate until last few weeks of run! • Only one expert, many changes • Will performance survive for Run8 and Run9?? • Trigger/level-2 configuration complicated – few know how to do it • Diagnostics weak for DAQ operator PHENIX - MJL

  25. PHENIX Issues & Failures - 2 • muTr HV trips & dead channels (capacitor removal in progress) • Level-2 analysis slow starting; partly because of slow DAQ level-2 start caused by struggles to get DAQ to run fast • SA2 under utilized • Communication in English difficult for some young subsystem specialists and shifters • recommend one person in subsystem team be fluent in English • Never had a chance to start new mandatory shift assignment scheme because of run start uncertainties • HBD data size • Already implemented more compact format, but will (hopefully) have many more good channels next year (~24/6) • Drop to fewer than 12 time samples? • Reduce large tail in event size with light baffling? • More sophisticated zero-suppression scheme • Haggerty-less operation next year – a challenge to us all PHENIX - MJL

  26. Other Issues • Water cooling • Availability of chiller & evaporator status to shift crews so they diagnose cooling problems quickly & call for help • Coupling of magnet and electronics cooling • Air conditioning • Humidity swings in IR, can they be minimized to alleviate HV problems? • Get all four air conditioners to run (most of the time) • Flammable gas detectors • Many recalibrations or head replacements • New technology that is stable at levels being monitored? • Fire Alarms & power shutdowns • HSSD smoke detectors? • Fix light bulb coupling to PHENIX power shutoff system • Magnet trips – CMI mostly • Access to MCR logbooks (readonly) for PHENIX shift crews • New xterm for acnlinxx access? • Communications between workers in IR and PHENIX control room for debugging problems quickly and efficiently (old radios not allowed)? • POTS with long cords or wireless phones? PHENIX - MJL

  27. Rough Survey of PHENIX Problems in Last 2 weeks of Run7 HV trips 161 HBD,muTr,DC,PC server/MF 10 massive trips 9 Front end feed 60 muTr AMU & glink Back end EB,BB,RC 34 EB,BB SEB,Corba Oncs Cleanup Magnet trips 14 CMI Cooling Water,A/C 8 or more… Power Off Fire Alarms 3 HSSD smoke detectors & Light bulbs PHENIX - MJL

  28. Concluding Remarks • Over 3 times Run4 luminosity (~813b/241b) PLUS new capabilities from new detectors • E.g. 3-4 times better Reaction plane resolution • Full /K/p PID up to 9 GeV/c • major advances in our physics should result • Analysis in progress already thanks to level-2 filtering & mature analysis model • HBD a very state-of-the-art detector, but lessons learned in Run7 should allow full operation in Run8 & beyond • Excellent stores when they could be delivered, but too many breakdowns • Stochastic cooling - a step towards the future • Low energy (9.2 GeV) running feasible PHENIX - MJL

  29. Backup PHENIX - MJL

  30. centrality selections are given by BBC charged multiplicity z-vertex selections by BBC [-40,40] cm [-30, -20] cm [-5,5] cm [20,30] cm total [~500] [500~1500] [1500~] RXN north charged mult. (a.u.) charged multiplicity in RXN (a.u.) RXN south charged mult. (a.u.) mid-central collisions < cos 2(Fsouth - Fnorth ) > Fnorth (rad) Fsouth (rad) PHENIX Reaction Plane Detector (RXNP) 200GeV Au+Au collisions RUN7 - 2007/Mar PHENIX - MJL

  31. Luminosity fraction captured by PHENIX DAQ saturation in red • Fraction of luminosity for late April stores (at bottom) • 97.8% for 4.8 khz DAQ rate • for ½ hr turn-on time 0 min 32 min 16 min 21 min 18 min 26 min 6 min starts at 10 am Fri Apr 27th PHENIX - MJL

  32. Average Improvement with SC: Improvement in integrated luminosity for PHENIX with Stochastic Cooling (SC) Store 8879 (no cooling) Store 8886 (cooling on) PHENIX - MJL

  33. Differentiation of vertex into distinct peaks due to Stochastic Cooling T. Roser’s vertex shape ZDC vertex (ZDC Wide) BBC vertex (BBC no vertex cut) BBC vertex (BBC ±30 cm vertex cut) PHENIX - MJL

  34. Data flow Input prdf flow Output plan A Output plan B HPSS  To HPSS  TB phenix Online filtered PRDF (21TB) srm/dcache 10 TB Offline filtered PRDF DST, 7 MB/s, srmcp srmcp ??? dccp srm/dcache @RCF bqs workers sps disk 4.1 TB cp srmcp Aggregation not done rftpexp DB snapshot, scp or bbftp ccphenix (database server) PHENIX - MJL

  35. Vanderbilt Farm 1600 CPUs, 80 TBytes disk FDT FDT 45 MB/s 45 MB/s 45TB and 200 CPUs Available for Run7 Reconstruction RCFRHIC computing facility Reconstruction 200 jobs/cycle PRDFs nanoDSTs 18 hours/job 3 1 770 GBytesper cycle PRDFs Raw data files GridFTP to VU 30 MBytes/sec 2 nanoDSTs Reco output to RCFGridFTP 23 MB/sec Dedicated GridFTP ServerFirebird 4 4.4TB of buffer disk space PHENIX - MJL

  36. HBD Status • We believe we have determined the main cause of the sparking problems with the both detectors: • Normal GEM spark would cause Lecroy HV to trip • Mesh also trips leaving large stored energy on filter capacitor • As GEM voltage goes to zero, large DV develops across gap between top GEM and mesh, ultimately resulting in a large spark • This spark induces sparks in other GEMs (massive trips) by propagation of scintillation light • There is however a danger in the “One source of all troubles” theory and we are still looking for more possible causes of the problems we had during the run from T.Hemmick PHENIX - MJL

  37. Pock Marks from T.Hemmick • Human eye could see the holes. • Holes smaller than pock parks. • Pocks almost certainly from meshGEM PHENIX - MJL

  38. EvB bufferbox Low Energy Running at PHENIX • 9.19 GeV/nucleon • PHENIX RXNP trigger • timed in at full energy • expect ~96% efficiency (compared to ~15% for BBC) • ZDC trigger should be very inefficient due to large Fermi motion wrt longitudinal momentum • Wednesday afternoon could run our DAQ with the “blue low-energy clock” • But Thursday morning, when beam was in the rings, we could not • Presumably due to glitches in the clock (associated with other clock events that were not there on Wednesday??) PHENIX - MJL