Contents. Assignment Current Status Handbook Change proposals Technical Installation Behavioural Research Project Legal aspects. Historical status. Installation status. Centrally controlled system Weather-feedback controlled Clockprogram 2x 600-700kW HR-boilers 25kg cooling machine

pello
Download Presentation

Contents

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Contents • Assignment • Current Status • Handbook • Change proposals • Technical • Installation • Behavioural • Research Project • Legal aspects

  2. Historical status

  3. Installation status • Centrally controlled system • Weather-feedback controlled • Clockprogram • 2x 600-700kW HR-boilers • 25kg cooling machine • Conditioned ventilation system

  4. Technical changes

  5. Draught preventing screen • To counteract the high door • Reduces draught at reception - Can save up to:

  6. Glass covering in patio’s - To reduce convection losses - Can save around:

  7. Courtyard covering - Cover the inner courtyard with glazed roofs  reduce energy use - used often for historic buildings  preserves historic character • Huge energy savings - Can save up to:

  8. Secondary Glazing • - Must be reversible in order to protect the significance of the building • - Need a sufficient gap (at least 200 mm) between the two sheet of glass • - If not possible to have a sufficient gap, one should consider double glazing (see next slide) • - Some systems can be removed easily in summer in order to take advantages of passive solar gain

  9. Double glazing • - Usually too tick to fit into existing timber window frame • - But now new products that are thinner but MORE expensive • - Need a cost-efficient analysis

  10. Film inside the window • - Easy step • - Less efficient than secondary and double glazing • - Different kind of films depending on the orientation of the windows • - Use it when secondary and double glazing not possible

  11. GG90-92: Secondary / Double glazing / Film

  12. Installation changes

  13. Solar panels - Usually used for hot water - BUT technically can be used for heating the building  Need bigger roof area - Can be installed on the extra building? in the big parking of GG 90-62?

  14. Solar photovoltaic - Cost much more than solar panels - Produce about half as much energy as solar panels - But this is electrical energy - Can be installed on extra building? In the big parking of GG 90-92?

  15. Electricity decision tree

  16. Insulation improvements on the floor -Improvement on the fabric of the building -> demand of energy lowers -Generally cost-effective -Protecting air circulation & natural materials

  17. CHP units -Cogeneration or combined heat and power -Creating energy, by-product heat -Energy & heat need to be levelled -Units: efficient -> lower energy & carbon emissions

  18. Infrared light switches - in areas that are not used frequently : bathrooms, stairways, conference rooms and janitor storage/closets. - One specific type of passive infrared switches (WSP250): • a built-in sensor holds the lights off when natural light levels are above the preset level • Result (according to the producer of WSP250): 60% energy savings

  19. Recycled paper for printers - fixed paper provider of the UM: Océ Business Services - propose the paper provider the idea of a pilot project: • Introducing one printer in each faculty which uses exclusively recycled paper • If this pilot project is successful, the university could start further negotiations about having all printers and copy machines print on recycled paper.

  20. Water taps • Faucet aerators: mix air into the water stream without affecting the water pressure • not expensive, easy to install, can use up to 50% less water, does not sacrifice comfort • 30 old taps in GG 90-92 • Green Roof • partially or completely covered with vegetation or soil  cut heating cost, reduce water run-off, increases the roofs life span • at additional building/ 72 “Oostgevel buitenberging” ?

  21. Behavioural aspects

  22. Online questionnaire • climate conditions at GG90-92 • energy consumption-related behaviour • attitudes on saving energy only 22 responses • Behaviour change: difficult due to trade-offs in time, cost, comfort

  23. “Be bright, turn out the light! WE Save Energy” • Education programs • Inform employees about changes • Social marketing strategies • paper note, (informative) poster • Feedback technologies • real time feedback • the Serious Game (Green My Place) • Moving an organization towards sustainability is an on-going process & takes time!

  24. Mistakes that should be avoided 1. No sense of urgency 2. No Powerful Guiding coalition 3. Lacking a vision 4. Not communicating the vision 5. Not removing obstacles to the vision 6. Not creating short term wins 7. Declare victory too soon 8. Not anchoring changes in the corporate culture

  25. Research project

  26. Look at influence of infrared heating system on concentration/learning performance • Mutual benefit

  27. Legal aspects

  28. When do you need an environmental permit? - Depend what kind of changes you want to do (see website) - NO for regular (low) maintenance and renovations to non-monumental parts (since 1 January 2012)

  29. What is the procedure when you need an environmental permit? - You can apply online - Extensive procedure = when you need to demolish partially or completely something - Regular procedure = Rest

  30. Costs - Depends on the construction costs - Construction costs = 50.000 or less  17 for each 500 but no less than 131 - Construction costs = between 50.000 and 250.000  1.704 + 16,21 for each 500 above 50.000 - Construction costs = between 250.000 and 500.000  8.185 + 15, 50 for each 500 above 50.000 Ect… (See website)

  31. Thank you for your attention