Hazard Mitigation

Hazard Mitigation. Seabrook-Hamptons Estuary Alliance. What is Mitigation?. “Hazard Mitigation is any action taken to reduce or  eliminate long term risk to people and property from natural disasters.  – FEMA. What is Mitigation?.

pelt
Download Presentation

Hazard Mitigation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Hazard Mitigation Seabrook-Hamptons Estuary Alliance

  2. What is Mitigation? “Hazard Mitigation is any action taken to reduce or  eliminate long term risk to people and property from natural disasters. – FEMA

  3. What is Mitigation? • Mitigation is one part of the Emergency Management Response Cycle

  4. Why Mitigate?

  5. Why Mitigate?

  6. Types of Hazard Mitigation Assistance funding

  7. Who is eligible?

  8. What if I am an individual homeowner? • If you are a homeowner your community must apply on your behalf

  9. Funding and Cost Share

  10. Types of Hazard Mitigation Assistance funding

  11. Hazard Mitigation Grant Program • Currently all funds available to NH under HMGP have been obligated or applied for.

  12. Eligible Hazard Mitigation Grant Program Projects 4105-DR Barrington, NH Young Road Culvert Project

  13. Flood Related Projects • Property acquisition and structure demolition • Property acquisition and structure relocation • Structure Elevation • Dry Flood proofing of historic residential structures

  14. Current HMGP projects

  15. Acquisition in NH-Conway 17 Homes were acquired by the Town of Conway using Hazard Mitigation Grant Program Funds following Hurricane Irene in 2011

  16. After acquisition-Conway

  17. Timeline Hazard Mitigation Grant Program * LOIs can be submitted any time of year *Work with Field Representative

  18. Timeline Hazard Mitigation Grant Program *Request for more information *FEMA review

  19. Timeline Hazard Mitigation Grant Program P&E=Performance and Expenditure

  20. Types of Hazard Mitigation Assistance funding

  21. Types of Mitigation Projects and Funding –Pre-Disaster Mitigation • Pre-Disaster Mitigation Funding will be available around August 2019 through a Notice of Funding Opportunity

  22. Pre-Disaster Mitigation Eligible Applicants

  23. Eligible Pre-Disaster Mitigation Projects PDM’13 Marlow, NH Sand Pond Road Culvert Project

  24. Types of Hazard Mitigation Assistance funding

  25. Types of Mitigation Projects and Funding-Flood Mitigation Assistance • Must be insured with NFIP • FMA 2019 will be available around August 2019

  26. Eligible Flood Mitigation Assistance Projects FMA’2010 Londonderry, NH Brookview Drive Elevation Project

  27. Timeline – PDM & FMA * LOIs can be submitted any time of year *Work with Field Representative

  28. Timeline – PDM & FMA

  29. Timeline – PDM & FMA

  30. Requirements for all programs

  31. General Eligibility Requirements for all program

  32. General Application Requirements for all programs

  33. Getting into the weeds

  34. Cost-Effectiveness and Cost Review • Pre-Determined benefits: • Acquisition $276,000 • Elevation:$175,000

  35. EHP Review and Compliance • Must comply with all EHP laws and with 44 CFR Part 10

  36. Floodplain Management and Protection of Wetlands • If the floodplain or wetland is the only practicable location, the Applicant/Sub-applicant must avoid or minimize adverse impacts to the floodplain or wetland.

  37. Property Acquisition-Application Types Two Types of Acquisition: • Property Acquisition and Structure Demolition • Property Acquisition and Structure Relocation

  38. Property Acquisition Additional Application Elements • Property value (pre-event or current) • Clear Title • Statement of Voluntary Participation • Final Mitigation Offer • Deed Restrictions

  39. Property Acquisition-Allowable Costs Make sure that your acquisition only includes allowable costs! These are different for each type of eligible project

  40. Property Acquistion-Closeout • Photograph of the property/Closeout site visit • Recorded Deed Restrictions • Latitude and longitude coordinates of the property • Required closeout documentation

  41. Where can I find guidance? • Hazard Mitigation Assistance Guidance • HMA Guidance Addendum (2015) • HMGP FEMA resources • PDM FEMA resources • FMA FEMA resources • NH HSEM Resource Center

  42. Questions?? AlexxMonastiero State Hazard Mitigation Officer Phone: 603.223.3657 Cell: 603.931.0215 Alexxandre.Monastiero@dos.nh.gov