An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Flexenclosure eCentre DRP VODACOM MOÇAMBIQUE

  2. Flexenclosure participants • Thomas Gustafsson, Customer Project Manager • Johan Thörnberg, Electricaland Cooling resp. • Mattias Stensson, Architectural and Structural resp.

  3. eCentre DRP layout

  4. eCentre DRP layout

  5. eCentre DRP layout withfutureexpand

  6. eCentre DRP Site layout withfutureexpand

  7. AC System • ATS design for 3 sources (grid and twogensets) • Design for max 400Amp 400V TN-S system (275kW) • Distribution accordingtosinglelinedrawing. (7233-E-001_Rev.02) • Control system ATS based on PLCsystem incl: monitoring system for electricalpower and cooling system

  8. AC System

  9. DC and Invertersystem • Main cabinet prepared for 24 rectifier @ 2900W tot 69,6kW • Extension cabinet prepared for 24 rectifier @ 2900W tot 69,6kW • Total capacity139,2kW • Cable cabinetbetweenmain and ext. cabinet • Recitifier 31pcs @ 2900W tot 89,9kW • Invertercabinet prepared for 20pcs inverter @ 1500VA tot 24kW/30kVA • Invertermodules 10pcs @ 1500VA tot 12kW/15kVA • Three batterycabinetand 48V batteri Enersys 12V190FT (48 block) • Battery backup time< 55 min @ 85 kW, 2h @ 42,5 kW

  10. DC and Inverter system

  11. Cooling System • 4pcs DX-units @ 35,6kW • Return air temperature 28°C • Supply air temperature 17°C • Ambient temperature40°C

  12. Raisedfloor system • Concentratedloads 5kN • Uniform distributed loads 8kN/m² • Floortilesureface ”Granit”

  13. Fire fighting system • FM200 system • Extinguishant control panel • Detection system

  14. Timeschedulingaccto layout rev 03 and current PO • Production finish – pick-up 2012-12-12 • Planned site start 2013-01-24 • Hand over 2013-02-08