1 / 10

Contract Specifications

Contract Specifications. Background on ODOT Plans & Specifications “Plans” = design drawings “Specs” = Standard Specifications and Boiler Plate Special Provisions and Special Provisions Project “Contract” = Plans + Standard Specifications + Contract Special Provisions

Download Presentation

Contract Specifications

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Contract Specifications • Background on ODOT Plans & Specifications • “Plans” = design drawings • “Specs” = Standard Specifications and Boiler Plate Special Provisions and Special Provisions • Project “Contract” = Plans + Standard Specifications + Contract Special Provisions • Contract Special Provisions = “Contract Specifications” • custom prepared during Project Development • Biologist needs to be proactive for edits

  2. Contract Specifications (cont.) • The good news: • Most of the FAHP requirements are already in ODOT’s Standard and BP SPs • The bad news: • Standard Specifications 2008 • Boiler Plate Special Provisions • 2008 plus many little updates • ODOT currently working on 2015 Specs • No new Boiler SP updates probably allowed in the mean time • This means...minor updates needed for Project Special Provisions to comply with FAHP BP SPs = Boiler Plate Special Provisions

  3. Contract Specifications (cont.) • Mobilization & Staging • Standard = Contractor designated & permitted. However, under ESA, effects may be considered Interrelated & Interdependent. • Agency may reduce the risk of potential regulatory violations by clearing and designating sites that are to be used for the Contract, and use SP00290.10.

  4. Contract Specifications (cont.) • Temporary Water Management, SP0245 • Unlike SLOPES IV, under FAHP, TWMP does not require Services review/approval. • Services can provide technical input on TWMP. • In-Water Work in streams with native fish • Add BP SP00290.34 for on-site meeting • Add BP SP00290.34(a, b), edited for project location • Willamette Falls IWWW exclusion • Depends on location & type work • Coordinate with Services

  5. Contract Specifications (cont.) BP SPs = Boiler Plate Special Provisions • General Equipment SP00290.34 • Edit BP SPs per User’s Guide (pgs 35-38) • Most relate to FAHP 150-ft buffer • Distance may be modified based on site conditions and justified in Project Notification • Goal is avoid polluting aquatic habitat • Reduce if some sort of barrier • Increase if wider floodplain or marsh • Special Aquatic Sites SP00290.34(c-4) • Use of pesticides or herbicides. Delete “herbicide” if allowed (pg 36) Page references are for May 2013 User’s Guide

  6. Contract Specifications (cont.) • Drilling, Boring, Jacking SP00290.34(c-8) • If IWW with ESA fish present, FAHP requires NMFS be contacted within 48 hours – Coordinate with Project Manager • Utility Lines SP00290.34 (c-13) • If IWW in ESA streams & Agency-controlled utility • New SP for FAHP • Save/re-using large wood, streambed gravel

  7. Contract Specifications (cont.) • SP00290.34(c-7) Hydroacoustics • As relevant, add and edit BP SPs per User’s Guide (pgs 36-37) • Distance & pile size depends on site conditions and effects to covered species • Early Coordination • Additional information in Project Notification • Add bubble curtain SPs if needed (Appendix 7) • Steller Sea Lion Haul Outs (pg 37) • Work Containment (SP 00290.42) • Unlike SLOPES IV, FAHP allows certain uses of treated wood & barges (pg 38)

  8. Contract Specifications (cont.) • Clearing & Grubbing (SP 00320) • Standard specs 00320.02, 00320.40, 00320.42 & 330.41 may be in conflict with FAHP regarding contractor requirements for removal & disposal • If applicable to project, add/edit BP: • SP00320(b-4) to protect trees & down timber • SP00320(b-5) to save/stockpile veg, trees, down timber for site restoration or mitigation • SP00320.42 to create Agency ownership • new SP00330.41(a-13) to save/stockpileboulders or stream gravels

  9. Contract Specifications (cont.) Page references are for May 2013 User’s Guide • Weed Control – Sec. 01030 • Under FAHP certain herbicides allowed in/near regulated habitat • FAHP very specific about application conditions, chemicals (pg 40-42) • Will require new SPs and inspections • Planting – Sec. 01040 • Many SPs needed for better success of habitat restoration & to support Plans • Waterway Enhancements – Sec. 01091 • SPs may be needed to support Plans

More Related