Offshore Wind and the European Supergrid

Offshore Wind and the European Supergrid. Joe Corbett, Head of Technical Services Mainstream Renewable Power Representing: Friends of the Supergrid. Offshore Wind Installations 2010. Source: EWEA http://www.ewea.org/index.php?id=1861. Offshore Generation Location up to 2010.

penelope
Download Presentation

Offshore Wind and the European Supergrid

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Offshore Wind and the European Supergrid Joe Corbett, Head of Technical Services Mainstream Renewable Power Representing: Friends of the Supergrid

  2. Offshore Wind Installations 2010 Source: EWEA http://www.ewea.org/index.php?id=1861

  3. Offshore Generation Location up to 2010

  4. Foundation Design Evolution

  5. Offshore Research • Hywind – Spar Type Floating Foundation • Norway 200m • Statoil • Blue H – Tension Leg Platform (TLP) • Netherlands 100m • Windfloat – Semi Submersible • Portugal 40m • Offshore Wind Accelerator • Carbon Trust + 8 Developers • Wind Analysis • Electrical and Foundation Design • Operation and Maintenance

  6. Offshore Trends Turbine Size Trend Source EWEA Principle Power’s Windfloat Design

  7. Why the Supergrid? • Move Offshore • Single European electricity market • Security and sustainability of supply • Carbon neutral Europe by 2050

  8. Supergrid Phase 1 – Design Drivers Offshore Wind 25-30 GW 2020 in the North Sea (UK, Germany, Belgium) UK Network Congested North Germany – High Wind Penetration Hydro balance capability

  9. Supergrid Phase 1 - Cost • Project Financing: • €28 billion (2010 value) • 30 % RoE • 6 year building time, 40 years of operation • 23GW of Wind Generation Connected • Capacity factor: • 40% - if the wind alone trades on the system • 90% - when wind and other energy/service providers use the network TUOS : 1,55 - 4,67 c/kWh Socialised: 0.23 c/kWh

  10. Technology Today (2015): • HVDC – VSC • 1 GW • Losses < 1.5% • HVDC Cables • XLPE – 300kV • MI (Oil) – 500kV

  11. Supergrid Technology (2015): • The SuperNode – Hybrid AC/DC Design • HVDC based on VSC (Voltage Source Converter) technology

  12. Technology Developments • Improved Converter Design • <<< Losses • >>> Power • Cable • >>> XLPE Voltage Capability • Multi-Terminal Wide Area Control System • System Dynamics • Inertia • Fault Performance • DC Switchgear • Onshore Transmission • GIL • Superconductivity

  13. Policy and regulatory aspects at a glance • Master Plan: Entso-e • One Operator: ISO • One Grid Code: Entso-e • One Regulator: ACER

  14. www.friendsofthesupergrid.eu Thank you for your attention