An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Development Checklists 4R PS&E

  2. Objective of the Development Checklists • Provide a concise list of elements for 4R PS&E development. • Provide consistency among PS&Es. • Identify the point when key activities crucial to the advancement of the PS&E should be completed.

  3. Checklist Milestones • 15% • 30% • 50% • 70% • 95% • 100%

  4. Use • Each checklist progressively advances the project elements. • Activities required to advance the design to the next phase are included to place emphasis on completing those activities at the appropriate time.

  5. Use • The originator initials each element that is completed, marks “I” for incorporation, or marks N/A if element is not applicable. • Having the originator validate that they have completed each element allows a significant number of those elements to be advanced without further review.

  6. 50% DEVELOPMENT CHECKLIST 4R Projects Only Originator: “INITIAL” in block to indicate those elements completed, including incorporation of data, place an “I” in the block to indicate those elements that are incomplete, or write “N/A” to indicate those elements not applicable to the project. Resubmit the checklist as necessary until all applicable activities are complete. POST 50% ACTIVITIES Activities to be conducted between the 50 and 70 percent reviews so data can be incorporated into the 70% PS&E package. ORIGINATOR (Initials) Revise the horizontal and vertical alignments and all other elements of the work that affect the final footprint; update the footprint impact; and submit the plan & profile sheets and cross-sections for review and approval prior to finalizing the right-of-way plans B3-Structural Design and Check Final TS&L (client approval) Provide final TS&L to Hydraulics and Geotechnical for final investigations

  7. Changes • Key design element are advanced into the 50% & 70% submittals • Reduced effort has been built into the 95% & 100% submittals • 95% PS&E is considered advertisement ready • 100% PS&E is essentially a delivery checklist

  8. Results • Lessens the last minute massive design effort • Provides for a complete review package at 70% • Controls the advancement of development and identifies causes for slip. • Improved Quality

  9. Location of Checklists • The checklists are located under the Design Resources tab on CFLHD’s website found at http://www.cflhd.gov/resources/design/index.cfm.

  10. What’s Next • Development of a 4R PS&E review checklist that provides a complete record of the elements reviewed. • The checklist identifies those elements that are key to the quality of the PS&E. • Does not include the minor elements that are validated by the Development Checklists.