An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Power Supply Adequacy AssessmentModel/Methodology Review Steering Subcommittee Meeting January 29, 2010

  2. Outline • Model Validation • Benchmarking Process • Sample Historical vs. Simulated Dispatch • Methodology Review • Current Adequacy Metric: LOLP • The Problem with LOLP • LOLP Subcommittee Suggestions • Next Steps Resource Adequacy Steering Committee

  3. Model Validation • HYDSIM vs. actual monthly generation • GENESYS vs. HYDSIM hydro generation output • Hydro peaking calibration • Trapezoidal Model/HOSS/Capacity Survey • Check random variable distributions • Water, wind, forced outage, load/temperature • Simulated thermal dispatch vs. historical dispatch • Simulated hydro dispatch vs. historical dispatch • Simulated dispatch vs. scheduler’s perspective Resource Adequacy Steering Committee

  4. Resource Adequacy Steering Committee

  5. Sample Comparison of Historical vs. Simulated Hydro Dispatch • Hourly hydro dispatch is highly dependent on hourly load shape • Historical and Genesys hydro load following is consistent • Illustrative only – based on old data and F&W constraints Resource Adequacy Steering Committee

  6. Methodology ReviewCurrent Adequacy Metric:LOLP

  7. GENESYS Simulation Illustrative Example Only Cold Hydro Limited Resource Adequacy Steering Committee

  8. Curtailment Events(Peaking problems and energy shortages) Each event has a peak and duration. Resource Adequacy Steering Committee

  9. What do we Count? • Ideally, we count “significant” events (those that we want to avoid) • Energy threshold (or contingency resource) is 1,200 MW for one day or 28,800 MW-hours from Dec-Mar • Capacity threshold (or contingency resource) is 3,000 MW in any hour from Dec-Mar and from Jun-Sep Resource Adequacy Steering Committee

  10. Curtailment Events(non-events not shown) Resource Adequacy Steering Committee

  11. Loss of Load Probability Simulated 300 winters (December through March) • Out of 300 winters, 15 had an average curtailment greater than 10 MW-seasons, which means that the • Winter Loss of Load Probability (LOLP) = 15/300 = 5 percent Resource Adequacy Steering Committee

  12. Energy LOLP(Sum of Curtailed Energy Dec-Mar) Resource Adequacy Steering Committee

  13. The Problem with LOLP

  14. Potential Problem with LOLPSame LOLP – Bigger Magnitude Resource Adequacy Steering Committee

  15. Potential Problem with LOLPLower LOLP – Bigger Magnitude Resource Adequacy Steering Committee

  16. LOLP Subcommittee Reportand Recommendations

  17. LOLP Subcommittee Report • Clearly define all reserve requirements • Operating reserves • Planning reserves • Wind integration reserves • Determine which reserve curtailments count toward LOLP • Add temperature-correlated wind as a random variable • Decouple temperature and water condition • Define a “contingency” resource for each month of the year instead of defining threshold events • Record curtailment events across all months of the year • Consider using other adequacy metrics • Continue to assess climate change impacts Resource Adequacy Steering Committee

  18. LOLP Review Status • Reserves • Work being done by PNUCC committee • Temperature-correlated wind • BPA working on a test data set • Decouple temp and water • Done • Contingency resource • Work needs to be assigned • Annual metric • Not yet started • Other metrics • BPA draft methodology • PSRI review • Climate change • Ongoing Resource Adequacy Steering Committee

  19. Next Steps

  20. Possible Modifications to the Current Method • Replace LOLP with an alternative metric • Use LOLP in conjunction with an alternative adequacy metric • Use LOLP in conjunction with the magnitude of the most severe event (or an average of the worst 10% of events) Resource Adequacy Steering Committee

  21. Examples of Other Adequacy Metrics • LOLE: loss of load expectation (%) • Number of hours with curtailment divided by the total number of hours simulated • Can be more intuitive, i.e. 99.5% reliable • Does not address magnitude • EUE: expected unserved energy (MW-hr) • Average amount of unserved energy per year • Lacks specific information about severe events Resource Adequacy Steering Committee

  22. Work Plan • PSRI review complete by early 2010 • Benchmark GENESYS by early 2010 • Tech Committee propose new metric and threshold by April of 2010 • Use new metric to assess 3 and 5 year adequacy by June 2010 Resource Adequacy Steering Committee