1 / 18

Group 1 JONG JIA XIN AE09045 RAJA HARTIENI BT RAJA MUHAMAD TAMRIN AE09028

UHL 2332 ACADEMIC REPORT WRITING. CONSTRUCTION PROJECTS DELAY. Group 1 JONG JIA XIN AE09045 RAJA HARTIENI BT RAJA MUHAMAD TAMRIN AE09028 NUR FAHRIZA BT MOHD ALI AE09007. INTRODUCTION. Construction projects delay problem appears

Download Presentation

Group 1 JONG JIA XIN AE09045 RAJA HARTIENI BT RAJA MUHAMAD TAMRIN AE09028

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. UHL 2332 ACADEMIC REPORT WRITING CONSTRUCTION PROJECTS DELAY • Group 1 • JONG JIA XIN • AE09045 • RAJA HARTIENI BT RAJA MUHAMAD TAMRIN AE09028 • NUR FAHRIZA BT MOHD ALI AE09007

  2. INTRODUCTION • Construction projects delay problem appears •  Influence the overall economy of a country

  3. RESEARCH OBJECTIVES

  4. RESEARCH METHODOLOGY • Setting • -Faculty of Civil Engineering • -30 samples (20 students and 10 Staff) • Data Collections • -Questionnaire • Data Analysis • -Code book

  5. Data analysis…...

  6. CAUSES Similar to the finding by: • Faridi and El-Sayegh (2006) • Kaming, Olomolaiye, Holt, and Harris (1997) • Acharya, Young, and Dal (2006)

  7. EFFECTS Not similar findings by : • Aibinu and Jagboro (2002) • Williams, T. (2003) • Iyer, Chaphalkal and Joshi (2008)

  8. LIMITATION and SUGGESTION

  9. Future research……

  10. CONCLUDING REMARKS

  11. `

  12. Thank you

More Related