1 / 15

Welcome to Surry Power Station 2018 Fall Outage Processing

Welcome to Surry Power Station 2018 Fall Outage Processing. Wayne Croshaw Processing Center Coordinator Fitness for Duty Administrator. Gravel Neck Processing Facility.

petersonb
Download Presentation

Welcome to Surry Power Station 2018 Fall Outage Processing

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Welcome to Surry Power Station2018 Fall Outage Processing Wayne Croshaw Processing Center Coordinator Fitness for Duty Administrator

  2. Gravel Neck Processing Facility The Gravel Neck Processing Facility at Gravel Neck Power Station is located 0.6 miles before the entrance to Surry Power Station Directions • Follow RT 10 to RT 650 N (Hog Island Road) • Turn RT at sign that says “Outage Workers” • Follow road to processing facility – bearing right, past Gravel Neck Power Station

  3. Gravel Neck Processing Facility Layout DLA MULTI-PURPOSE Dominion Orientation 0700 on First Day of Arrival FFD PARKING PROCESSING [Dominion directs from here] TRAINING ROADWAY

  4. 2018 Fall Outage Processing Gravel Neck Outage Processing will open on Monday, October 1st at 0700 am and will remain open through the first week of the outage. The Processing day begins with a Site Orientation Briefing starting at 0700 am. The orientation is mandated by station management and must be attended by all personnel.

  5. 2018 Fall Outage Processing • Personnel arriving each day are expected to be on site and to be seated in the orientation room prior to the start of the 07:00 am morning briefing. Personnel who miss orientation will be required to complete it the next business day. • After orientation, small groups will proceed to the Processing Center for check in. • Food service and vending will be available at Gravel Neck.

  6. 2018 Fall Outage Processing . • Parking: All personnel reporting to Gravel Neck may park at the Gravel Neck facility in designated areas. The outer lot will be utilized for contingency and spill over parking. • Personnel Completing Requirements at Gravel Neck will report on site at Surry for additional requirements such as hand geometry, TLD issuance. • Personnel are expected to cooperate fully by moving expeditiously through the process, completing all requirements in an efficient and professional manner. Full cooperation is expected and appreciated.

  7. 2018 Fall Outage Processing . Valid non-expired government issued photo identification is required for processing. This is a requirement and cannot be waived. You will be turned away if you do not have proper identification. Vendors must advise the processing center (in advance) when altering projections or substituting personnel. Dominion Site Representatives should be aware of and approve all changes. Personnel are expected to conduct and present themselves professionally . Personnel are not to access the Gravel Neck Gas Fired Complex adjacent to Gravel Neck.

  8. 2018 Fall Outage Processing . Fatigue – Personnel arriving for outage processing are expected to arrive Fit for Duty. Personnel who present with any indications of fatigue or impairment will not process that day. The Vendor Representative will be responsible for seeing that they are provided transportation offsite. Personnel must be able to pass medical screening and be declared medically Fit for Duty. Personnel requiring respirator are expected to arrive with physicals updated.

  9. 2018 Fall Outage Processing . Personnel are expected to self assess for the following factors prior to processing or commencement of duties: • Mental Stress, Fatigue, or Illness • Use of prescription or over-the-counter drugs • Any condition or impairment from fatigue, or any cause that could adversely impact the ability to perform duties safely and competently.

  10. 2018 Fall Outage Processing Personnel are expected to fully disclose impairing prescription drugs and any legal actions. Five Hour Abstinence Rule – means that anyone consuming any performance impairing substance within five hours of reporting violates the FFD Rule. This means alcohol as well as impairing medications. Keep in mind that this does not mean that you will not test positive for alcohol if you consumed alcohol outside of five hours prior to reporting. A number of factors determine how fast alcohol is absorbed from the body including age, weight and food consumption.

  11. 2018 Fall Outage Processing Confirmed Positive Test for alcohol is declared when: • A reading of .04 percent BAC or higher • A reading of .03 percent BAC, donor at work for 1 hour at time of test (including breaks, rest, lunch) • A reading of .02 percent BAC or higher, donor at work for 2 hours (including breaks, rest, lunch) Any alcohol detected will impact site access. Zero Tolerance

  12. 2018 Fall Outage Processing Code of Federal Regulations - FFD Testing 10 CFR 26 “Any act or attempted act to subvert the testing process, including, but not limited to, refusing to provide a specimen and providing or attempting to provide a substituted or adulterated specimen, for any test required under § 26.31(c) must result in the immediate unfavorable termination of the individual's authorization and permanent denial of authorization thereafter.” IS IT WORTH THE RISK?

  13. 2018 Fall Outage Processing FFD Behavior Observation Behavior Observation is the responsibility of every Nuclear Worker. All personnel must report known violations of the FFD program to management and FFD Program personnel. Failure to report known violations constitutes a violation of the FFD program and will result in revocation and denial of unescorted access.

  14. 2016 Fall Outage Processing Surry Site Information Gravel Neck paper badges will be issued and must be worn at all times while on site until traded for the Station Badge. Parking on site is limited to designated parking areas. Check with your vendor representative or Security on your area. Parking passes for the site will be issued and must be displayed.

  15. 2016 Fall Outage Processing Surry Site Information Site Representatives will be informed when badges are printed. Personnel may not report to the Processing Center unless notified of badge readiness. Your badge will not be ready any quicker because you come to check on it. We will contact the Vendor Representative , who will contact the employee, once the badge is ready and available. Checking on badge status by individuals only distracts In-Processing personnel and slows the process for everyone.

More Related