Status Report of Taiwan Two Meter Telescope. Yi Chou Graduate Institute of Astronomy National Central University. 2M Telescope Project. Project started in early 2006 Funding Ministry of Education:5500 project Telescope : ~2.6M USD National Science Council Instrument: ~1.3M USD
E N D
Status Report of Taiwan Two Meter Telescope Yi Chou Graduate Institute of Astronomy National Central University 2011兩岸天文儀器會議
2M Telescope Project • Project started in early 2006 • Funding • Ministry of Education:5500 project • Telescope : ~2.6M USD • National Science Council • Instrument: ~1.3M USD • NCU Foundation • Building, dome & Transportation : ~3.5M USD • Total: ~7.4 M USD 2011兩岸天文儀器會議
Telescope 2011兩岸天文儀器會議
2M Telescope 2011兩岸天文儀器會議
Telescope Manufacture • Nishimura Opt. Ltd. won the contract and started to design and build the telescope in early 2007. 2011兩岸天文儀器會議
Telescope Manufacture 2011兩岸天文儀器會議
Telescope Design (10/2007) 2011兩岸天文儀器會議
Primary Mirror Polishing (06/2008) 2011兩岸天文儀器會議
Primary Mirror (02/2009) 2011兩岸天文儀器會議
Parts of Telescope (02/2009) 2011兩岸天文儀器會議
Taiwan Two Meter Telescope (03/2010) 2011兩岸天文儀器會議
Integration Test (03/2010) 2011兩岸天文儀器會議
2M in Taiwan Now (in a Warehouse) 2011兩岸天文儀器會議
Site and Building 2011兩岸天文儀器會議
NCU Mt Jade ~4,000 m Lulin Observatory~2,860 m Alisan 2011兩岸天文儀器會議
Lulin Observatory 40 cm Telescope LOT 1meter teelscope Future 2M Telescope EPA Lab TAOS-A/B Weather Station TAOS-C NCKU ELF TAOS-D Taida LELIS 基地台 2011兩岸天文儀器會議 環保署
Sketch Maps of 2M Telescope and Observatory Sketch Map of the 2m telescope and observatory Imaginary view of the 2m Observatory 2011兩岸天文儀器會議
Difficulties We Met …… • However, there is a new regulation in Taiwan that the mountain area above 1500 m was assigned as protected area and only limit buildings are allowed. Astronomical observatory was not included. • Thank to assistant from Chairman Wang of Legislative Yuan to coordinate government ministries, astronomical observatory was finally put into the list in late 2007. • The building permit was issued on 11/15/2008 from Chiyi county government. • A local company won the contract for the building and was ready to start the construction in May 2009 …… 2011兩岸天文儀器會議
Difficulties We Met …… • In May 2009, Environment Protection Administration (EPA) informed us the construction must be suspended because the 2M building is located inside an animal protection area. • Environmental impact assessment must be done in advanced. • In this animal protection area, four season’s animal inspection is essential. • The building permit was invalid • The building contract had to be rescinded • Environmental impact assessment was made from Oct 2009 to Nov 2010 and the report was approved by EPA in March 2011. The new budget was set and the construction will be started soon. 2011兩岸天文儀器會議
Instrument 2011兩岸天文儀器會議
Instrument • The first generation instrument for 2M telescope is the Simultaneous Multi-color Imager. • This 4-color simultaneous imager consists of • Dichroic mirrors and filters • split the light into 4 bands: 552-689nm(r), 691-815nm(i), 815-915nm(z) and 967-1024nm(y) • higher QE CCD cameras • 3 sets of 1100-series cameras were purchased from Spectral Instruments Inc.,USA, within E2V back illuminated deep depletion CCDs for r,i,z bands • The other one (NCU-Cam1), with within fully depleted CCDfrom Hamamatsu photonics K.K., Japan. and Polycold cryo-cooler, is developed by NCU instrument team 2011兩岸天文儀器會議
4-color Simultaneous Imager 2011兩岸天文儀器會議
4-color Simultaneous Imager 2011兩岸天文儀器會議
Instrument Lab at NCU • To make the multi-color imager for 2M telescope, as well as for future instrument developments, NCU set up an instrument lab in early 2009. • Key persons of NCU lab • Jason Wu: Electrical engineer • Duncun Chen: Project assistant • Azure Yang: Project assistant 2011兩岸天文儀器會議
Instrument Development 2011兩岸天文儀器會議
Three 1100-series Cameras Arrived 2011兩岸天文儀器會議
A 1100-series Camera Tested with LOT 2011兩岸天文儀器會議
LOT/SI1100 First light Image 2011兩岸天文儀器會議
LOT/NCUcam-1 First Light Image 2014/6/5 2011兩岸天文儀器會議 31
Optical Adopter Design Complete 2011兩岸天文儀器會議
Optical Adopter 2014/6/5 2011兩岸天文儀器會議 33
Summary • The manufacture of telescope has been completed and the telescope has shipped to Taiwan in 2010. • The environment impact assessment has been completed and the new budget has set. The construction will be started soon/ • The 4 cameras, including the one we develop (NCUcam1), and the optical system for the 4-color simultaneous imager have been complete. The integration test cannot be done due to the delay of telescope dome construction. • We are now looking for suitable telescope that allows us to test instrument’s performance, or, furthermore, start scientific observations. 2011兩岸天文儀器會議
Thank You 2011兩岸天文儀器會議