230 likes | 352 Views
Quality Control. Charts. Industrial Revolution led to Assembly Lines Many workers are now responsible for a finished product rather than one person. How do we detect and correct mistakes before the finished product is made? The process used to check is called Quality Control.
E N D
Quality Control Charts
Industrial Revolution led to Assembly Lines • Many workers are now responsible for a finished product rather than one person. • How do we detect and correct mistakes before the finished product is made? • The process used to check is called Quality Control.
Quality Control • Uses small samples and a control chart with constants to detect deviations from the norm. • Control Chart uses the following: a. Means b. Medians c. Ranges d. Standard Deviations
Control Limits • Understanding the quality control process means understanding the variations that exist when a product is manufactured. • For example, a company wishes to make rope that has a breaking strength of 50 pounds. There WILL always be small variation in each rope. Therefore, the manufacturer will set limits – a maximum and minimum acceptable value. • These limits are called the upper and lower control limits.
In Control?????? • Once a graph is made to analyze, use the following rule to decide if a process is “in control” or “out of control.” • The graph exceeds the upper and/or lower control limits OUT OF CONTROL • The graph is within the upper and/or lower control limits IN CONTROL
Control Chart Construction • Select several samples of the product and test their means. • Compute a variation measure. Use the range for an - chart. • Computer the upper and lower control limits and the grand mean. Represent these on a graph with lines
Control Chart Construction…. • Plot the means of the samples • Analyze it to see if it is in control or out of control. • If out of control, find the problem and fix it. • Do the process again.
Types of Control Charts • There are 2 types of control charts: • Variable Charts – used to analyze measurements such as lengths, weights, breaking strength, etc. • Attribute Charts – used to analyze a manufacturing process that can be classified as acceptable or defective.
We are going to construct a type of variable chart called an - bar chart.
- bar chart construction • Find the mean and range of each sample. • Find the grand mean, , and the mean of the ranges, . • Find the upper and lower control limits using the formulas and where is found from the table of constants. • Draw the chart using the grand mean as the center line and the calculated upper & lower limits. • Plot the mean for each sample and analyze. Decide if it is in control or out of control. = + = -
Example 1 • A manufacturer of rope selects six samples of five ropes each and tests the breaking strength of each. (See next slide) • Construct an - bar chart for the data. • Analyze the results.
= 46.2 = 51 = 49.6 = 50.4 = 47.8 = 50.6 = 2 = 4 = 3 = 3 = 5 = 3
= 46.2 = 51 = 49.6 = 50.4 = 47.8 = 50.6 = 2 = 4 = 3 = 3 = 5 = 3 Next, find the Grand Mean, (the mean of the sample means), and the mean of the Ranges. = = 49.3 =
Now find the Upper and Lower Control Limits using the following formulas. = + = - is found from the table of constants
How do you find ? • You must use “n” to find the value for . • “n” is the number of items in each sample. In our example n = 5. • We’ll use the value of 0.577 for .
Now find the Upper and Lower Control Limits using the following formulas. = + = - = 49.3 – (0.577) (3.33) = 47.38 = 49.3+(0.577) (3.33) = 51.22 = 49.3 Now, put these on a graph and plot the mean of all of the samples to see if it is in/out of control
= 46.2 = 51 = 49.6 = 50.4 = 47.8 = 50.6
Example 2 • A pressure valve is designed to release at 200 psi. Ten sample of six valves each were selected and tested. The mean and range for each sample are shown in the table. Construct and analyze a quality control chart.
= = 201.96 = = = 0.483 (at n = 6) = + =201.96+(0.483)(2.13) = 202.99 = - =200.93