The ABB Solution for the E&P Industry. Organization:- ONGC Limited, India Project :- Enterprise Wide SCADA System for the Production and Drilling Facilities. BU (Oil and Gas), ABB limited, Bangalore. Intro – The Organization ONGC Ltd.
E N D
The ABB Solution for the E&P Industry Organization:- ONGC Limited, IndiaProject :-Enterprise Wide SCADA System for the Production and Drilling Facilities BU (Oil and Gas),ABB limited, Bangalore
Intro – The Organization ONGC Ltd. • The Organisation ONGC Limited – Oil and Natural Gas Corporations limited is a Navaratna Public Sector Unit. A Company floated by Government of India • Listed in BSE (Bombay Stock Exchange) and has market capitalisations of over 40 billion USD. Single largest company in BSE. • It produces 27 MMT Crude Oil and 26 bcm of Natural Gas. • The company has a profit of 2 busd and has Capital Expenditure over 4 busd every year. • Going aggressively around the world to meet India's energy requirement through a subsidiary called OVL (ONGC Videsh limited). • ONGC also floated a joint venture with LN Mittal Steel Co (Single largest UK based steel baron) for the E&P business and has acquired block in Africa • Primary business is E&P and now venturing into the Refining and Petrochemicals sectors. • The present E&P Business if spread across the length and breadth of India and SCADA is envisaged at present for Indian installations
The Project Envisaged • Enterprise Wide SCADA for all Production and Drilling Facility of ONGC Spread across India and in Arabian Sea. • The project is envisaged by core design and engineering team of ONGC under the initiative of Chairman of ONGC Limited • Main reason for ONGC to think about such LARGE architecture • Efficient Real time Monitoring of the Production and Drilling Parameters across all the assets in India • Remote control of the production well in case of Offshore platform • Facilitate offline analysis of the Valuable/ High Producing Wells through third party E&P Applications. • Provide summarised information to the management for effective decision making • Total Facelift in the day to day operation of ONGC Production and Drilling facility to improve the efficiency
Competition Faced • Totally 17 No of bidders took the tender, some of the major are Honeywell India, Yokogawa, Emerson, EIL, L&T, etc. • Only ABB and Honeywell could submit the offer due to short time and large volumes of the project. • With in three week of submission the Honeywell bid was technically rejected on account of qualification criteria in terms of • No Proven track record of Multi tier SCADA Architecture • Non Field bus compliant RTU without Asset Management • Capability to execute the project • Only ABB Price bid is opened after technical evaluation • We went for a hard negotiations for 4 months period and finally won the order above 10% of ONGC budget. • ABB two year plus pre-bid selling of the SCADA and Fieldbus compliant RTU has helped to build the confidence in ONGC and bag such a big order. • With this order ABB India is a Undisputed leader in upstream oil and gas solution in India.
The Scope of Supply and Work • Scope of Supply • Supply of Three Tier SCADA Architecture as Production SCADA and Drilling SCADA spread across 19 Assets/252 Locations in India. The Production SCADA is ABB SCADA Vision and Drilling SCADA is NOV solution • RTU with FF based Instrument for the Production installation to enable data acquisition and asset management. RTU used is ABB AC800F and Total Flow series. • Supply of 16 Data Centres including the corporate data centre across India to enable efficient operation of respective Assets. • UPS for all the 250 plus tier 1 control room of production and drilling SCADA along with FCBC for 85 no of remote RTU with solar chargers. • SAP, Epinet, VRC- Integrations of Real-time and History Data. • 10 No Network Management Station along with firewalls and Routers for all the assets • Disaster Recovery Solution for the Tier 3 SCADA of the corporate data centre. • Scope of Work • Erections and Commissioning of above scope and warranty for one year • AMC of 6 years after warranty
Unique Features of the SCADA Project • Single Largest Instrumentation- Automation – IT Solution project finalised in India – The order value is 95 musd • Largest three tier network of Near real time process data monitoring. The no of HMI Station in a single largest Network - 1300 Plus HMI Stations and 600 Plus Servers • Largest Project in term of the FF based Instrumentations and automation solution – 7500 FF instrument and 850 FFH1 segments • First Ever project with FF and Hart based RTU and Asset Management. • Largest project in terms of Field Instrumentation scope of supply • Largest Oil and Gas producing wells connected to the SCADA system – 7000 Wells • Single largest contract to build 179 Control rooms, 16 Data centres and 75 Mobile Control rooms at 250 plus locations.
The Asset Details • The Asset is a Onshore or an Offshore production facility in that region for the ONGC. • Tier 2 Level SCADA is proposed at the each asset location which will collect the data from Tier 1 SCADA under that asset. • The Tier 1 SCADA will be used for following facilities with in the asset • Group Gathering Stations (GGS) • Gas Collecting Station (GCS) • Central Tank Farm (CTF) • Central Processing Facility (CPF) • Early Production System (EPS) • Gas Compressor Plant (GCP) • Effluent Treatment Plant (ETP) • Water Injection Plant (WIP)
TDMA LINK ENGINEERING STATION HMI HMI COLOR NETWORK PRINTER HMI ALARM PRINTER L2 SWITCH CONVERTOR AC800 F AC800 F S800 IO H1 Segments H1 Segments H1 Segments RACK MOUNTED SERVERS REDUNDANT PRODUCTION SCADA SERVER Typical Tier 1 Production SCADA (SCADA Vision) Config To Tier 2
TDMA LINK Typical Tier 1 Drilling SCADA(NOV) Config Existing at Rig side New at Rig side To Tier 2 TOOLPUSHER GEOLAB CHEMLAB Router FW WITS Rig Server w/ Drilling SW Apps + Web Server Database Server Color Inkjet Printer DAQ Sensors Existing Rig Server to be Interfaced to Tier 1 Drilling SCADA on WITSML Protocol
WEB SERVER Typical Tier 2 SCADA (Production and Drilling) Config DATA TO TIER 3 LOCATION ENGINEERING STATION B/W NETWORK PRINTER COLOR NETWORK PRINTER HMI HMI HELP DESK HMI FIREWALL LEASED LINE 2 Mbps ALARM PRINTER (PRODUCTION) FROM TIER 1 TRAINING SIMULATOR • RACK MOUNTED SERVERS • REDUNDANT PRODUCTION SCADA SERVER • REDUNDANT DRILLING SCADA SERVER • DUAL REDUNDANT COMMON DATABASE SERVER • APPLICATION SERVER (PRODUCTION) • APPLICATION SERVER (DRILLING)
Typical Tier 3 SCADA (Corporate Office) Config LEASED LINE 2 Mbps To DRS Site
SCADA Vision Applications- Well Test • Automatic and Manual well test at the Tier 1 GGS and EPS SCADA • Well test Data to be available UPWARD in Tier 2 and Tier 3
SCADA Vision Applications- Mass Balance, Well flow status • Mass balance for the Field to Asset is provided • Mass Balance for the Pipeline is provided • For high flowing wells we are providing well flow status. • Gas Lift Optimisation for the some of the oil wells. This cover Continuous and Intermittent Gas lift
(CBF) Control Builder F Typical Offshore RTU Config To Other RTU Stations Through TDMA (Radio Frequency/V-Sat Link / OFC Link) SCADA Vision Server Radio Terminal Terminal Sever TCP/IP Terminal Sever AC800F RTU TCP/IP Profibus Module FF HSE Module TIER-1 STATION • All AC800F based RTU to have FF and Hart interface. LD800HSE is used for the FFH1 • Maintenance Assist Management in Tier 1 SCADA LD800 HSE RLM PROFIBUS S800 IO With HART S800 IO With HART H1 Segments H1 Segments H1 Segments FIELD SIGNALS THROUGH BARRIERS & RELAYS RTU STATION
Field Instrumentations • Type of Instrument to be supplied are as follows • Mass Flow Meter with NOC – 386 No • Thermal Mass Flow Meter – 178 No • Ultrasonic Mass Flow Meter – 105 • PT,DPT,TT on FFH1– 6000 No • Radar Gauges FFH1 based – 1000 No • Low Power RTU ABB Total Flow XRC series • Well Head Mounted RTU – 12 No • FDT DTM with FBB to be used for the Hart and FF configurations • SCADA Vision to is Used for the Maintenance Assist Management
800xA in ONGC Organization:- ONGC Limited, IndiaProject :-ONGC Hazira DCS/ESD and APC BU (Oil and Gas),ABB limited, Bangalore
ONGC Hazira – DCS/ESD/APC • ONGC Hazira is a Gas Processing Complex of ONGC • It has LPG, GSP, CPP and Utilities with ABB (Bailey), YIL, Honeywell DCS system installed • ABB, YIL and Honeywell has quoted for the Job • YIL is technically rejected and we became Lowest w.r.t Honeywell system • This order is a replacement of the YIL DCS of the LPG Plant. • We also have N-90 /I-90 system running in the same complex for last 2 decade • Tier 1 SCADA node is also coming up in the Hazira site for hooking this plant information to ONGC Corporate Collaboration Centre in Delhi • First Installation of the 800xA in Public Sector Oil Companies with SIL 2 and SIL3 System
ONGC Hazira – DCS/ESD/APC - Scope • Scope of Supply • Two 800xA systems • 6 PM864 Controller,6 no of PM 865 Controllers, 4500 S800 IO Points • 10 HMI station and 2 ES stations • Safeguard System for the ESD • APC for the LPG Plant – ABB Italy • OPC interface of INFI -90, Honeywell GUS, Yokogawa Centum System • Modbus based instruments through Terminal server • Field Instruments like PT,TT,FT etc. • Scope of Work • Erection and Commissioning of the DCS/ESD system with one Year Warranty • 5 Years of AMC after warranty.