This comprehensive evacuation plan outlines designated assembly areas, main office, facilities, and emergency shut-off procedures for Petrodiamond's main site. Be prepared and stay safe with this detailed guide.
E N D
A B D C Petrodiamond H E G F Tesoro I A – Main Entrance/Guard Station B – Evacuation Assembly Area C – Main Office/Body Shop/ Parts/Stalls Short D – Long Stalls E - FAQ F – Carwash/Maintenance G – Gasoline ASTs/Fuel Island H – Blue Building I – Pasha Bldg. /Mechanics Shop/Sherriff’s Office
MAIN FACILITY/BODY SHOP SITE PLAN – C on Site Map 1 2 2 1 1 2 Main Office/ Administration Paint Mix Room 5 2 Drawing Not To Scale Approximate Scale 1 inch = 33 ft. 2 Bodyshop Office 2 2 1 2 - HAZMAT • HAZWASTE 1 1 – Overhead Door 2 – Door 3 – Loading Dock 4 – Battery Charging Station 5 – Spill Kit 2 4 Parts Warehouse 3
- HAZMAT • HAZWASTE MECHANIC SHOP SITE PLAN – I on Site Map 1 1 1 1 2 1 ENTER/EXIT ENTER/EXIT ENTER/EXIT 2 2 5 6 2 2 7 2 ENTER/EXIT ENTER/EXIT ENTER/EXIT 1 1 1 1 – Overhead Door 2 – Door 5 – Spill Kit 6 – Gas Cylinders 7 – Universal Waste Drawing Not To Scale Approximate Scale 1 inch = 55 ft.
Gasoline ASTs/Fuel Island SITE PLAN – G on Site Map F H E 9 8 5 10 5 E – Emergency Shut-off Gasoline F - Carwash 5 – Spill Kit 8 – AST Monitoring 9 – Leak Detection 10 - ASTs Drawing Not To Scale Approximate Scale 1 inch = 14.3 ft.