1 / 22

CO:LAB ALUMINIUM TECTONICS

Discover how Ashtech's sustainable, ventilated aluminium cladding systems protect buildings while offering stunning design options. Learn about the efficient manufacturing process and solutions provided.

phuth
Download Presentation

CO:LAB ALUMINIUM TECTONICS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CO:LAB ALUMINIUM TECTONICS School of Architecture Group 3 Alvin Amito Amani Ahmed Aqsa Mahmood Mah KinYew figure: ashandlacy.com, 2012

  2. ASHTECH Rainscreen Cladding Systems Rainscreen cladding is a unique method of cladding or overcladding a building to provide weather protection for the building fabric and structure. Ashtech rainscreen cladding systems provide a low maintenance, sustainable external ventilated ‘cold’ façade using aluminium sheet, aluminium composite material (ACM), and other metals such as steel and copper, which are formed into cassettes available in a variety of horizontal and vertical joint arrangements, including 3-D geometric designs. (ashandlacy.com, 2012) figure: Thomas Ferens Academy, Kingston

  3. Rain Screen Manufacturing Process

  4. Three Key Stages Rain Screen Manufacturing Process Design office Design office rain screen shop drawing design and layout in office CNC Cutting CNC Cutting ACM cut to size according design using CNC machine at factory Folding and Assembly Finished product packed and deliver to site for installation ACM folded into box form and secured it with rivet or rubber glue 1/4/2020

  5. Freedom Panel Folding and Assembly Folding and Assembly Preparing Clean up work top Place Flat sheet on worktop Touch up edges Touch up sharp corners Folding 4 sides Fold corner Took out ACM plastic cover Install extrusion Corner Treatment Melting rubber glue+tape Drill + rivets Cut off extra rubber Sharp edges treatment Stack up Send for Packing figure: freedom panel,Halesowen Bus Station (ashandlacy.com, 2012)

  6. Preparing Clean up work top Place Flat sheet on worktop Touch up edges Touch up sharp corners

  7. Preparing Clean up work top Place Flat sheet on worktop Touch up edges Touch up sharp corners

  8. Folding Fold corners Took out ACM plastic cover Install extrusion - Drill + Rivet

  9. Folding Fold corners Cut out ACM side plastic cover Install extrusion - Drill + Rivet

  10. Folding Fold corners Cut out ACM side plastic cover Install extrusion -Drill + Rivet

  11. Folding Fold corners Cut out ACM side plastic cover Install extrusion -Drill + Rivet

  12. Folding Fold corners Cut out ACM side plastic cover Install extrusion -Drill + Rivet

  13. Corner Treatment Melting rubber, glue+tape Cut off extra rubber

  14. Stack up Send for Packing

  15. Stack up Send for Packing

  16. AshTech produced varies types of products to provide options for the market and also provide design and solutions to designers Observe and analytical The manufacture process : design office > CNC cutting > folding & assembly are simple and effecient to apply to other sytems figure: ashtech system (ashandlacy.com, 2012)

  17. Observe and analytical Hook on panel

  18. Initial Response to Design Brief Birmingham Conservatoire

  19. Conservatoire Live performance Space Quality Daylight Experimental Music Dynamic Initial Response to Design Brief

  20. Initial Response to Design Brief Initial sketches – movement

  21. " Interactive Wall" Interactive Kinetic Light Dynamic Movement Initial Response to Design Brief

  22. End

More Related