1 / 10

WARRANT 8

WARRANT 8.

pia
Download Presentation

WARRANT 8

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WARRANT 8 Ann S. Soderstrom Library Revitalization Project To see if the Town will vote to authorize the Trustees of the Tucker Free Library to remove and use Fifty Thousand Dollars ($50,000) from the Ann S. Soderstrom Trust for the purpose of constructing a dedicated media center and reading area. This area will include new work stations and painting. Additionally, carpeting will be replaced throughout the building. Selectmen recommend. Library Trustees recommend. WARRANT 8

  2. ANN S. SODERSTROM Ann S. Soderstrom

  3. MEDIA CENTER & QUIET ROOM MEDIA CENTER & QUIET ROOM

  4. NEW DESIGN OF STACK ROOM NEW DESIGN OF STACK ROOM

  5. NEW HAMPSHIRE ROOM TODAY NEW HAMPSHIRE ROOM TODAY

  6. NEW DESIGN OF NEW HAMPSHIRE ROOM NEW DESIGN OF NEW HAMPSHIRE ROOM

  7. EXAMPLES OF WEAR & TEAR ON CARPET EXAMPLES OF CARPET WEAR & TEAR

  8. EVERYDAY FOOT TRAFFIC HAS DAMAGED HARDWOOD FLOORS EVERYDAY FOOT TRAFFIC HAS DAMAGED THE HARDWOOD FLOORS

  9. THERE IS NO RECORD OF THE TERRAZZO FLOOR EVER BEING PROFESSIONALLY CLEANED There is no record of the terrazzo floor ever being professional cleaned

More Related